Laserfiche WebLink
Truck Bed (volume) Basis: <br />Truck <br />Loader <br />Struck Volume: <br />7.00 <br />LCY <br />Heaped Volume: <br />8.00 <br />LCY <br />Average Volume: <br />7.50 <br />LCY <br />Adjusted Volume: <br />7.52 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes: 6.86 LCY <br />Loading Tool Capacity <br />Rated Capacity: <br />Bucket Fill Factor: <br />Adjusted Capacity: <br />Job Condition Corrections: <br />Bucket Size Class: Small <br />0.080 LCY (heaped) <br />0.875 Loose material - 1/2" to 3/4" (85 - 90 %) 0.875 <br />0.858 LCY <br />Site Altitude (ft.): 5400 feet <br />Net Correction: 0.830 0.747 <br />Loading Tool Cvcle Time: Number of Loading Tool Passes Required to Fill S <br />Excavators and Front Shovels: <br />Truck: <br />Machine Cycle Time vs. Job Condition Rating SEVERE <br />Selected Value within this Basic Rating: SEVERE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />passes <br />Wheel and Track Loaders - Unadjusted Basic Leader CN cle Time (load, dump, maneuver): NA minutes <br />Cticle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Adj : <br />1.000 <br />0.900 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 0.830 0.747 <br />Loading Tool Cvcle Time: Number of Loading Tool Passes Required to Fill S <br />Excavators and Front Shovels: <br />Truck: <br />Machine Cycle Time vs. Job Condition Rating SEVERE <br />Selected Value within this Basic Rating: SEVERE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />passes <br />Wheel and Track Loaders - Unadjusted Basic Leader CN cle Time (load, dump, maneuver): NA minutes <br />Cticle Time Factors <br />0.500 <br />Factor (min.) <br />Source <br />Material: <br />NA <br />NA <br />(Cat HB) <br />Stockpile: <br />NA <br />NA <br />(Cat HB) <br />Truck Ownership: <br />NA <br />NA <br />(Cat HB) <br />Operation: <br />I NA <br />I NA <br />I (Cat HB) <br />Dump Target: <br />I NA <br />I NA <br />I (Cat HB) <br />Net Cycle Time Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />Truck Cycle Time: <br />Track Exchange Time: 0.50 Minutes <br />Truck Load Time: 2.830 Minutes <br />Truck Maneuver and Dump Time: 0.80 Minutes <br />NA minutes <br />0.390 minutes <br />2.830 minutes <br />Adjusted for site altitude: <br />0.500 <br />Minutes <br />Adjusted for site altitude: <br />3.144 <br />Minutes <br />Adjusted for site altitude: <br />0.800 <br />Minutes <br />CIRCES Cost Estimating Sott -ware <br />