Laserfiche WebLink
TRUCK /LOADER TEAM WORK <br />Task description: Clean Sediment Pond I <br />Site: Northfield Mine <br />PROJECT IDENTIFICATION <br />Permit Action: 2012 Bond <br />Recalculation Permit/Job #: C2006085 <br />Task #: 076 Stater Colorado <br />Date: 1/25/2012 Countv: Fremont <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team - Truck: Generic 7 -8 cy, 4x4 <br />- Loader: Cat 320D L 9' -6" Stick <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C085 -076 <br />Shift basis: 1 per dad <br />Cost Breakdown: Truck/Loader Team Sunnort Fortlntnent Maintenance Fauinment <br />Total work team cost /hour: $197.00 <br />MATERIAL QUANTITIES <br />Initial volume: 1,800 CCY Swell factor: 1.000 <br />Loose volume: 1,800 LCY <br />Source of estimated volume: Exhibit Y, Division Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (ivei�zht) Basis: <br />Material weight: 2,700 Pounds/LCY` <br />Description: Earth - Wet excavated <br />Rated Payload: 201,300 Pounds <br />Payload Capacity: 7.52 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$8.71 <br />$24.63 <br />NA <br />NA <br />NA <br />NA <br />Operating cost /hour: <br />$35.30 <br />$45.70 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost /hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$38.67 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$44.00 <br />$109.00 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $197.00 <br />Support: $0.00 <br />Maint $0.00 <br />Total work team cost /hour: $197.00 <br />MATERIAL QUANTITIES <br />Initial volume: 1,800 CCY Swell factor: 1.000 <br />Loose volume: 1,800 LCY <br />Source of estimated volume: Exhibit Y, Division Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (ivei�zht) Basis: <br />Material weight: 2,700 Pounds/LCY` <br />Description: Earth - Wet excavated <br />Rated Payload: 201,300 Pounds <br />Payload Capacity: 7.52 LCY <br />CIRCES Cost Estimating Software <br />