My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-25_REVISION - C2006085
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2006085
>
2012-01-25_REVISION - C2006085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:56 PM
Creation date
4/3/2012 12:25:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085
IBM Index Class Name
Revision
Doc Date
1/25/2012
Doc Name
Bond Liability Recalculation (Emailed)
From
Jim Stark
To
Janet Binns
Type & Sequence
TR1
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck Travel (Haul & Return) Time: Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />penetration 5.0 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Travel <br />(Ft) <br />Production <br />( %) <br />( %) <br />(fpm) <br />Time <br />( %) <br />(fpm) <br />61,00 LCY/Hour Adjusted for job efficiency: <br />50,63 LCY/Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks <br />(min) <br />1 <br />2100.00 <br />3.00 <br />5.00 <br />8.00 <br />1381 <br />1.549 <br />Haul Time: 1.549 minutes <br />Return Route: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $2.102 ILCY <br />Total job time: 19.20 Hours <br />Total job cost: $3,782.83 <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Production <br />112.94 LCY/Hour Adjusted for-job efficiency: <br />(Ft) <br />Truck Unit Production <br />( %) <br />( %) <br />(fpm) <br />61,00 LCY/Hour Adjusted for job efficiency: <br />50,63 LCY/Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks <br />2 Truck(s) <br />Adjusted hourly trick team production: 101.26 <br />LCY/Hour <br />i(min) <br />LCY/Hour <br />1 <br />2100.00 <br />-3.00 <br />5.00 <br />2.00 <br />2905 <br />0.754 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $2.102 ILCY <br />Total job time: 19.20 Hours <br />Total job cost: $3,782.83 <br />CIRCES Cost Estimating Software <br />Return Time: 0.754 <br />minutes <br />Total Truck Cvcle Time: 6.747 <br />minutes <br />Loading Tool unit <br />Production <br />112.94 LCY/Hour Adjusted for-job efficiency: <br />93.74 LCY/Hour <br />Truck Unit Production <br />61,00 LCY/Hour Adjusted for job efficiency: <br />50,63 LCY/Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks <br />2 Truck(s) <br />Adjusted hourly trick team production: 101.26 <br />LCY/Hour <br />Adjusted single truck/loader team production: 93.74 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 93.74 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $2.102 ILCY <br />Total job time: 19.20 Hours <br />Total job cost: $3,782.83 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.