Laserfiche WebLink
Truck Travel (Haul & Return) Time: Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />penetration 5.0 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Travel <br />(Ft) <br />Production <br />( %) <br />( %) <br />(fpm) <br />Time <br />( %) <br />(fpm) <br />61,00 LCY/Hour Adjusted for job efficiency: <br />50,63 LCY/Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks <br />(min) <br />1 <br />2100.00 <br />3.00 <br />5.00 <br />8.00 <br />1381 <br />1.549 <br />Haul Time: 1.549 minutes <br />Return Route: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $2.102 ILCY <br />Total job time: 19.20 Hours <br />Total job cost: $3,782.83 <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Production <br />112.94 LCY/Hour Adjusted for-job efficiency: <br />(Ft) <br />Truck Unit Production <br />( %) <br />( %) <br />(fpm) <br />61,00 LCY/Hour Adjusted for job efficiency: <br />50,63 LCY/Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks <br />2 Truck(s) <br />Adjusted hourly trick team production: 101.26 <br />LCY/Hour <br />i(min) <br />LCY/Hour <br />1 <br />2100.00 <br />-3.00 <br />5.00 <br />2.00 <br />2905 <br />0.754 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $2.102 ILCY <br />Total job time: 19.20 Hours <br />Total job cost: $3,782.83 <br />CIRCES Cost Estimating Software <br />Return Time: 0.754 <br />minutes <br />Total Truck Cvcle Time: 6.747 <br />minutes <br />Loading Tool unit <br />Production <br />112.94 LCY/Hour Adjusted for-job efficiency: <br />93.74 LCY/Hour <br />Truck Unit Production <br />61,00 LCY/Hour Adjusted for job efficiency: <br />50,63 LCY/Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks <br />2 Truck(s) <br />Adjusted hourly trick team production: 101.26 <br />LCY/Hour <br />Adjusted single truck/loader team production: 93.74 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 93.74 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $2.102 ILCY <br />Total job time: 19.20 Hours <br />Total job cost: $3,782.83 <br />CIRCES Cost Estimating Software <br />