Laserfiche WebLink
Page 1 of 114 <br />COST SUMMARY <br />Task description: Partial Phase II Bond Release SL -03 Cost Summary <br />Permit Action: Partial Phase II Bond <br />Site: Yoast Mine Release SL -03 Permit /Job #: C1994082 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 09- Nov -11 Countv: Routt <br />User: JRS <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C082 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />005 <br />010 <br />011 <br />012 <br />013 <br />014 <br />018 <br />019 <br />020 <br />021 <br />022 <br />023 <br />024 <br />025 <br />028 <br />02a <br />02b <br />02f <br />030 <br />031 <br />032 <br />033 <br />034 <br />035 <br />036 <br />037 <br />03a <br />03b <br />03f <br />040 <br />041 <br />043 <br />044 <br />Grade Drill Pads Associated with Minor Revision <br />18 <br />DOZER <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />2 <br />1 <br />2 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1.09 <br />$966.57 <br />$3,534.00 <br />$14,641.00 <br />$2;524.00 <br />$11,868.00 <br />$10,097.00 <br />$4,672.54 <br />$4,049;00 <br />$9,268.00 <br />$1,219.00 <br />$366,80 <br />$316.97 <br />$21,766.80 <br />$2,667.09 <br />$4;419.00 <br />$55,926,55 <br />$6,93115 <br />$1,583.57 <br />$14,102.80 <br />$7,887.22 <br />$25,130.24 <br />$13,991.85 <br />$1;652.00 <br />$186,319.47 <br />$71,477:28 <br />$11,678.70 <br />$20,230.89 <br />$3;538.79 <br />$80794 <br />$34,253.84 <br />$25,895.79 <br />$49,78913 <br />$95,143.85 <br />Rip Permanent Roads <br />RIPPER <br />3.73 <br />Rip Haul Roads <br />RIPPER <br />15.46 <br />Rip Facilities Area <br />RIPPER <br />2.66 <br />Rip Explosives Area <br />RIPPER <br />1.97 <br />Rip Final Regraded Areas <br />RIPPER <br />10.66 <br />Narrow Permanent Roads <br />DOZER <br />5.26 <br />Grade Permanent Roads to Blend <br />GRADER <br />30.13 <br />Grade Haul Roads to Blend <br />GRADER <br />68.97 <br />Grade Light -Use Roads <br />GRADER <br />9.07 <br />Regrade Access Road to Drill Pad #2 from Minor <br />Revision 18 <br />DOZER <br />0.41 <br />Regrade Temporary Access Road to Pond 010 <br />DOZER <br />0.58 <br />Grade Haul Road Surface Material into Fill <br />DOZER <br />24.50 <br />Grade Facilities Area Surface Material into Fill <br />DOZER <br />3.00 <br />Finish Grade All Areas <br />GRADER <br />33.76 <br />Grade Valora Pit N/S Highwall <br />DOZER <br />62.94 <br />Grade Valora Pit E/W (Scraper Pit) Highwall <br />DOZER <br />7.80 <br />Grade Neck Pit Highwall <br />DOZER <br />1.78 <br />Regrade Pond 010 <br />DOZER <br />54.00 <br />Regrade Pond 011 <br />DOZER <br />30.20 <br />Regrade Pond 012 <br />DOZER <br />96.23 <br />Regrade Pond 014 <br />DOZER <br />53.58 <br />Regrade All Ditches <br />GRADER <br />12.22 <br />Construct Post-Mining Drainage Channels <br />EXCAVATE <br />444.69 <br />Regrade Pond I IA <br />DOZER <br />28.63 <br />Regrade Pond 12A <br />DOZER <br />44.72 <br />Grade Valora Pit N/S Spoil Ridges <br />DOZER <br />22.77 <br />Grade Valora Pit E/W (Scraper Pit) Spoil Ridges <br />DOZER <br />3.98 <br />Grade Neck Pit Spoil Ridges <br />DOZER <br />0.91 <br />Replace Topsoil from Stockpile A to Pond 010 <br />SCRAPERI <br />20.76 <br />Replace Topsoil from Stockpile B to Shop Area <br />SCRAPERI <br />15.70 <br />Replace Topsoil from Stockpile Haul Fill from to <br />Neck Pit <br />SCRAPERI <br />30.18 <br />Replace Topsoil from Stockpile I to Entrance Road <br />and Wadge <br />SCRAPERI <br />57.67 <br />Yoast Mine C -1994 -082 Partial Phase II Bond Release SL -02 CIRCES Cost Estimating Software <br />