Laserfiche WebLink
Page 6 of 9 <br />Table 46, Site 301: Temperature <br />Mar, Apr, May, Jun, Jul, Aug, and <br />Sep; Water Quality Apr, and May <br />Table 47, Site 69: Temperature <br />Mar, Apr, May, Jun, Jul, Aug, and <br />Sep; Flow Apr, May, Jun; <br />Table 48, Site 1005: Temperature <br />Mar, Apr, May, Jun, Jul, Aug, and <br />Sep; Flow Jun; <br />Table 49, Site 29: Temperature <br />Mar, Apr, May, Jun, Jul, Aug, and <br />Sep <br />13. Filing frequency of <br />CDRMS regulation <br />pond reports <br />4.05.9(17) <br />YES <br />14. Timely filing of <br />CDRMS regulation <br />pond reports <br />4.05.9(17) <br />YES <br />15. Content of pond <br />CDRMS regulation <br />reports <br />4.05.9(15) <br />YES <br />16. Sampling frequency <br />Exhibit 14 of CDRMS <br />No information was provided for <br />of ground water <br />mining permit C -82 -056 <br />NO <br />AVM -15 in the AHR <br />monitoring wells <br />17. Parameters to be <br />Exhibit 14 of CDRMS <br />No information was provided for <br />analyzed in ground <br />mining permit C -82 -056 <br />NO <br />AVM -15 in the AHR <br />water samples <br />Surface facilities and underground <br />workings of the Foidel Creek Mine <br />19. Restoration of <br />lie downhill from the outcrop belt <br />ground recharge to <br />CDRMS regulation <br />that rims the Twentymile Park <br />approximate pre- mining <br />4.05.12(3) <br />YES <br />Syncline. Ground water is <br />recharged in this outcrop belt. <br />rate <br />The mine has not disturbed the <br />rocks in this outcrop belt which <br />does not diminish the amount of <br />recharge. <br />Compliance with the Basic <br />Standards for ground water, as in <br />20. Prevention of <br />item 10, indicates the permittee is <br />adverse impacts to <br />CDRMS regulation <br />preventing adverse impacts to <br />ground water systems <br />4.05.11(1) <br />YES <br />ground water quality outside the <br />outside permit area <br />permit area. Monitoring data <br />indicate the permittee is <br />preventing impacts to water <br />quantity outside the permit area. <br />