Laserfiche WebLink
Page 5 of 9 <br />AV -2 (Foidel Creek alluvium.) The <br />mine's annual hydrology reports <br />contain long -term data from these <br />wells. These data show the Foidel <br />Creek mine is in compliance with <br />the Basic Standards for Ground <br />Water at the points of compliance. <br />11. Sampling frequency <br />Exhibit 14 of CDRMS <br />The report indicates all sampling <br />at surface water <br />mining permit C -82 -056 <br />YES <br />frequencies were met. <br />Based on the approved Table A in <br />Exhibit 14 of the C -82 -056 mining <br />permit, the following <br />discrepancies were found in the <br />following tables for the 2011 <br />Water Year: <br />Table 34, Site 8: Temperature <br />May, Jun, Jul, 4 weeks in Aug, and <br />first 2 weeks Sep ; Flow March, 1 <br />time Apr <br />Table 35, Site 900: Temperature <br />May, Jun, Jul, 4 weeks in Aug, and <br />first 2 weeks Sep; Flow Mar, 2 <br />times Apr, May, June, July, 4 <br />weeks in Aug and first 2 weeks in <br />Sep <br />12. Parameters to be <br />Table 37, Site 16A: Temperature <br />sampled at surface <br />Exhibit 14 of CDRMS <br />May, Jun, Jul, 4 weeks in Aug, and <br />water sites <br />mining permit C -82 -056 <br />NO <br />first 2 weeks Sep; Flow 3 weeks in <br />Aug and 1 week in Sep <br />Table 39, Site 27A: Temperature <br />May, Jun, Jul, 4 weeks in Aug, and <br />first 2 weeks Sep; Flow 3 weeks in <br />Aug and lweek in Sep; <br />Table 40, Site 1003: Flow 3 weeks <br />in Aug and 1 week in Sep; <br />Temperature May, Jun, Jul, 4 <br />weeks in Aug, and first 2 weeks <br />Sep <br />Table 42, Site 305: Flow Apr, May, <br />Jun <br />Table 43, Site SW13: <br />Temperature 4 quarters <br />Table 44, Site SW14: <br />Temperature 4 quarters, Flow 2 <br />quarters <br />Table 45, Site SW15: Temperature <br />4 quarters, Flow 2 quarters <br />