Laserfiche WebLink
C -2010 -089 PARNos. 1- 1A -1B, 2- 2A -2B, 3 <br />New HorizonNorth Mine Page 30 of 60 <br />3 The fourth paragraph refers to a "loop road" around the pit. Please provide a typical <br />illustration of the "loop road in relation to the pit, highwall, backfilled area, and haul roads. <br />Item r esoh ed in Alay -2011 resl)onse. <br />4. The fourth paragraph refers to Small Area Exemptions 46 from the NI-12 permit. Rather <br />than referencing the NI-12 permit, please provide any SAE details specific to the NHN Mine <br />for incorporation into Section 2.05.3 (4) (see below) of the PAP. Iterrr r swh.,e in flay -2011 <br />5. The middle paragraph on Page 2 of Section 2.05.3 gives 35.2 degrees as the angle of repose <br />for overburden spoil, while Map 2.05.3 -1 shows 32 degrees. Please revise one or both for <br />consistency: .ltent resolved in 1GIt�i, -2011 resjf onse <br />6. Map 2.05.3 -1 illustrates a typical cross section view of the pit. Please revise the overburden <br />ahead of and behind the pit, respectively, to illustrate the presence of the "soft" overburden <br />that does not require blasting to be removed, and will be placed in the uppermost reaches of <br />the backfill. Item resolved in Altc3 >m2011 response. <br />7. The last sentence on Page 2 refers to Map 2.05.3(3) -1, which is Surface Water Hydrology in <br />the original PAP. Please verify that the intended neap is referenced here. Item resolved in <br />1l t(y -2011 rye lyonse. <br />8. The last sentence of the second paragraph on Page 4 refers to the Special Use Permit. Please <br />indicate that the SUP is from Montrose County. Item revoh,e€l in 111aj7- 2011 rejyons <br />9. The fourth paragraph on Page 4 indicates that roads, buildings, ponds, culverts, ditches and <br />other structures are discussed in Section 2.05.3(3). Please revise this to state that ponds, <br />other treatment facilities and diversions are discussed in Section 2.05,3(4). Item resolvell in <br />1111th= -2011 response. <br />10. Table 2.05.3 -3 describes the general timing of operations at the NHN Mine. Please add the <br />anticipated construction and reclamation of the Equipment Corridor and any necessary <br />utility relocations to this list. terrz resoh7et rr Tl -21111 re l)onse; <br />2.05.3'3 —Mine facilities <br />Page 3 of Section 2.05:3(3) contains a general discussion of Support Facilities and Utility <br />Installations. Please provide a map, in accordance with Rule 2.10.3, which depicts the <br />facilities at a scale sufficient to see the various buildings, utilities, and intersection of the <br />haul road with the County Road at the southern edge of the permit area. Item resolved in <br />1 play -21111 r slronsc <br />2. In the Fuel Storage section, please include the tanks used to store used oil for use in heating <br />the truck shop (if such a facility is proposed here, as is found at theNH2 Mine). <br />The Division was unable to find the new text in the Fuel Storage section, Please review and <br />revise as appropriate. Item resshed in Dec-2011 r°esl)onse. <br />3. Rule 2.05.3(3)(c)(v) requires a description of measures to be used to ensure that the interests <br />of the public and landowners affected are protected if the applicant seeks Division approval <br />of conducting the proposed surface mining activities with 100 feet of right -of -way line <br />of public road, except where mine access or haul roads join that right-of-way. The <br />Division understands that for the Special Use Permit, WFC has requested approval to disturb <br />