Laserfiche WebLink
C-2010-089 PARNos. 1- 1A -1B, 2- 2A -2B, 'I <br />New Horizon North Mine Page 31 of 60 <br />the ground surface to within 25 feet of the County's right-of-way. Please incorporate this <br />information into the text and map(s) of the PAP. Itent resoh,ed in Altt17-2011 revj)onse. <br />4. On Page 13 of Section 2.05.3(3), in the County Roads section, please add the phrase, "the <br />outside right-of-way of immediately prior to "current public roads." <br />The text does not appear to have been added, as requested. Item resored in Dec-2011 <br />resimnse. <br />5. The Division has several comments regarding Map 2,05.3(3)-2 - Haul Road Alignment and <br />Details: <br />a) No Legend has been provided. Please provide a Legend that identifies all features and <br />symbols. Bent reso&ed inJTI(ti,-2011 response. <br />b) The font used for Haul Road stationing in the plan and profile views is too small. <br />Please increase the font size. It may be preferable to show the stationing only at <br />increments of 500 feet, and use tick-marks for the intermediate 100-foot stations. <br />The stationing labels in the plan view are still too small to read. Please increase the font <br />size of the labels. [tent ivsohyed in Dec-2011 res]-)onse. <br />c) One segment of the East Haul Road appears to have a grade of 12.41 %. The Rules <br />preclude the use of grades steeper than 10%. Please review the profile and revise <br />accordingly. Item resoh.,ed in Mt�v-2011 resImnse. <br />d) The alignment shown for the West Haul Road appears to encroach upon the proposed <br />location of Pond NHN 002. Please review and revise as appropriate, in order to keep <br />the haul trucks out of the pond. Item reso&ed in -ffay-2011 reVI)OIlse. <br />e) On the Haul Road profiles, please add the various culvert pipes in their respective <br />locations, and identify features such as Meehan Draw. ftent revohwd in ltltrr-2011 <br />resImnse. <br />f) The Typical Section depicts only the "fill" situation. Please modify the typical section <br />to also represent the "cut" situation. Item resolved in 31(ry-2011 re.vj)onse. <br />6. Please provide a Plan and Profile for the proposed Equipment Corridor. Although not a <br />Haul Road, per se, it will be used by various pieces of heavy equipment, and will cause <br />disturbance which will need to be reclaimed. Item re�vohyed in,41qy-2011 ix,rsj)onse. <br />