Laserfiche WebLink
- Dater 'Truck- I Water Tanker, 5,000 Gal, <br />tost Br"k&wn- <br />TrudWLoad6r Te <br />MA ErtI V rE S <br />— UU <br />Initial volume: 2,700 <br />CCY Swell factor: IJ65 <br />Loose volume: 3,146, <br />LCY <br />Source of estimated volume: <br />Division of Reclamation, Mining & Safety; Map 15 <br />Water Truck <br />II�Iia <br />Material Purchase Cost: <br />$0.00 <br />Total Cost: <br />WOO <br />HOURLY PRODUCTIQN <br />too <br />Trugic Capati=. <br />Truck Payload (wet ghq,Basis <br />Material weight, 2,900 <br />Pounds/LCY <br />�I�M2 <br />Operating cost/hour: <br />Pounds <br />$69,00 <br />NA <br />Ripper op. sUhour: <br />$0.00 <br />NA <br />$1967 <br />NA <br />Wo& <br />Support: <br />$20556 <br />$176,q7 <br />Total work team cost[hour: $681.28 <br />MA ErtI V rE S <br />Initial volume: 2,700 <br />CCY Swell factor: IJ65 <br />Loose volume: 3,146, <br />LCY <br />Source of estimated volume: <br />Division of Reclamation, Mining & Safety; Map 15 <br />Source of estimated swell factor <br />Cat Handbook <br />Material Purchase Cost: <br />$0.00 <br />Total Cost: <br />WOO <br />HOURLY PRODUCTIQN <br />Trugic Capati=. <br />Truck Payload (wet ghq,Basis <br />Material weight, 2,900 <br />Pounds/LCY <br />Description: Decomposed rock - 50% Rock, 50% Earth <br />Rated Payload; 27,280 <br />Pounds <br />Payload Capacity: 9.41 <br />LCD" <br />CIRCES Cwt atinuffing Softwam <br />