Laserfiche WebLink
RMOHM Woik*�tt Cotitd () <br />In <br />M. I man, Ent M- <br />oil M�K <br />fliullinic 1.379 minutes <br />CIRCES Cost Estimating Software <br />Haul Distance Roll. Res <br />Tota Res Velocity <br />Tra el <br />(F0 <br />00m) <br />Tif ne <br />Loading Tool unit <br />min <br />Production <br />3600M 0.00 3.00 <br />2874 <br />230.56 LCY/Hour <br />CIRCES Cost Estimating Software <br />Return Time: 1.281 <br />minutes <br />Total Truck Cycle Time: $.161 <br />minutes <br />Loading Tool unit <br />Production <br />277.78 <br />LCY/Hour Adjusted for job efficiency: <br />230.56 LCY/Hour <br />Truck Unit Production <br />91.55 <br />LCY/Hour Adjusted for job efficiency; <br />75.99 LCY/Hour <br />Optimal No. of Trucks: <br />3 <br />Truck(s) Selected Nurnber of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 227.96 <br />LCY/Hour <br />Adjusted single trucM,oader team production: 227 . 96 <br />LCY/Hour <br />-- - <br />Adjusted multiple truck/toader team production: 227.96 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />I <br />Tearn(s) Total job tlrnc: 20.44 <br />Hours <br />Unit cost: <br />$2.989 <br />/LCY Total job cost: $13,926.57 <br />CIRCES Cost Estimating Software <br />