Laserfiche WebLink
Struck Volumc <br />8.00 <br />LCY <br />H*ed Volume- <br />10.00 <br />LCY <br />Averve volum <br />9.00 <br />LCY <br />Adjusted Vblutue: <br />9,41 <br />LCY <br />Task # 001 <br />Final Truck Volume Based on Number of Loader Passes.- 7.88 Ley <br />Loa—diny—Tool Cayaci!y <br />kated C <br />Bucket Filt=il <br />AA4djuste Apacit <br />Bucket Size Class: Medium <br />Site Altitude (ft.): 4500 feet <br />Cycle Tunt Factors <br />Net Cycle Time Adjustment: NA <br />minutes <br />Adjusted Loader Cycle Time: 0,367 <br />minutes <br />Net Load Time per Tru& 1.201 <br />minutes <br />Truck C <br />Acle Time: <br />Truck Ownership: <br />0,50 Minutes Adjusted for site altitude <br />0-500 Minutes <br />Truck Load Time: <br />Operadow <br />1.201 Minutes <br />Truck Maneuver and Dump Timer <br />UO Minutes Adjusted for site altitude: <br />0.800 Minutes <br />CIRCFS Cost Estimating Software <br />Net Cycle Time Adjustment: NA <br />minutes <br />Adjusted Loader Cycle Time: 0,367 <br />minutes <br />Net Load Time per Tru& 1.201 <br />minutes <br />Truck C <br />Acle Time: <br />Truck Exchange Time: <br />0,50 Minutes Adjusted for site altitude <br />0-500 Minutes <br />Truck Load Time: <br />201 Minutes Adjusted for site attitude: <br />1.201 Minutes <br />Truck Maneuver and Dump Timer <br />UO Minutes Adjusted for site altitude: <br />0.800 Minutes <br />CIRCFS Cost Estimating Software <br />