My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-23_APPLICATION CORRESPONDENCE - C2010088 (2)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010088
>
2012-01-23_APPLICATION CORRESPONDENCE - C2010088 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:45 PM
Creation date
3/23/2012 9:57:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
Application Correspondence
Doc Date
1/23/2012
Doc Name
Revised Cost Estimate (Emailed)
From
Jim Stark
To
Mike Boulay
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Remove FM from Haut Road #1 and Place on Facilities Area <br />Sitc: Fruita Loadout Permit Action: New Permit <br />Perm it/Job #: <br />C2010088 <br />PROJECT DDENTTFICATION <br />Task ## State: Colorado Abbreviatiow <br />None <br />Date: 30-Aug- I I County, Mesa <br />Filename: <br />User, JRS <br />_0088-001 <br />Agency or organization naine: DRMS <br />IBC URLYSQUIPMENT COST Shift basis: -1 Xer day <br />E ut ' ment Desc . tion <br />Truck Loader Team -Truck: Generic 8 -11i cy, 6x4 <br />-Loader: Cat 330C L <br />Support Equipment -Load Area: NA <br />-Dump Area: Cat 139RL9S.U(2005) <br />Road Maintenance —Motor Grader: CAT 1214 <br />-Water Truck: Water Tanker, 5,000 Gatti <br />-----Cost B Truck/Loader Team Su port Equt pment <br />Maintenance Equipment <br />Truck Excavator <br />Load Area <br />Dump Area <br />Motor Grader Water Truck <br />%Utilization-machine: <br />100 100 <br />NA <br />100 <br />50 <br />100 <br />Ownership cost/hour; <br />$9,28 $37,65 <br />NA <br />$49.19 <br />$18,09 <br />$22.04 <br />Operating cost/hour., <br />$41.86 $69,00 <br />NA <br />$117.89 <br />$17A <br />$42.16 <br />Ripper op. cost/hour- <br />NA $0.00 <br />NA <br />$0.00 <br />$0,00 <br />$O.00 <br />Operator cost/hour: <br />$17:00 $38.67 <br />NA <br />$38.49 <br />$38A9 <br />_$39.70 <br />Unit Subtotals: <br />$5L 14 $145,33 <br />NA <br />$205.56 <br />$74.07 <br />$102.90 <br />Number of Units: <br />3 1 <br />0 <br />1 <br />J <br />Group Subtotals: <br />Work: $298.75 <br />Support: $205.56 <br />Maint: $17&97 <br />Total work team cost/hour, $681.28 <br />MATE RILLQUANTITIES <br />Initial volume: 4,000 CCY Swell factor 1.165 <br />Loose volume: 4,660 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety; Mqpj5 <br />Source of estimated swell factor: Cat Handhook___ <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload Lweight) Basis: <br />Material weight! 2,900 Poundg/LCY <br />Description: Decomposed rock - t3 °fa Rock, 50% Earth <br />Rated Payload: 27,280 Pounds <br />Payload Capacitym 9.41 LCY <br />CIRCES Cost Fsdrwting 5oftware <br />
The URL can be used to link to this page
Your browser does not support the video tag.