Laserfiche WebLink
TrueVLoadcr Worksheet Cont' d <br />Task # 002 Page 2 of <br />Truck Bed (voluej Basis: <br />Struck Volume: 8.00: <br />L Y <br />Heaped Volume: 10.00 <br />LC <br />Average Volume: 9.00 <br />LC'Y <br />Adjusted. Volume: 9.11 <br />LCY" <br />Cycle Time Elements (miu.): <br />Load: NA Maneuver. VA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Leader Cycle Time (load, dump, Maneuver): NA minutes <br />Adjusted, Loader Cycle Time: 0.367 minutes <br />Net Load Time per Truck: 1.201 minutes <br />Truck Cycle,Time, : <br />Truck Exchange Time: 0,50; Minutes Adjusted for site altitude .500 Minutes <br />Truck Load Time- 1.201 Minutes Adjusted for site altitude: 1.201 Minutes'; <br />Truck Maneuver and Dump Time 0.80 Minutes Adjusted for site altitude: 0.800 Minutes <br />CIPCES Cost Estimating Software <br />