My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-23_APPLICATION CORRESPONDENCE - C2010088 (2)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010088
>
2012-01-23_APPLICATION CORRESPONDENCE - C2010088 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:45 PM
Creation date
3/23/2012 9:57:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
Application Correspondence
Doc Date
1/23/2012
Doc Name
Revised Cost Estimate (Emailed)
From
Jim Stark
To
Mike Boulay
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ti4cWL64det Wdikifteet Coht'd <br />Truck Tta�l: jqgjg�& RetatnIT' <br />M_ I <br />Viul Ztute! <br />Task # 002 Page 3 of 3 <br />Road Condition: Firm, smooth. tolling, dirtiIt. surfaced, watered, <br />Haul Time: 0,688 minutes <br />F.173TIMMIMMI <br />Haul Distance <br />1 Haul Distance- <br />RolIT.Res <br />Travel <br />i Travel <br />Time <br />Loading Tool unit <br />Production <br />277.78 LCY/Hour Adjusted for job efficiency: <br />0.688 <br />Haul Time: 0,688 minutes <br />F.173TIMMIMMI <br />Haul Distance <br />Return Time.- 0.603 <br />RolIT.Res <br />Travel <br />minutes <br />Loading Tool unit <br />Production <br />277.78 LCY/Hour Adjusted for job efficiency: <br />230.56 LCYMour <br />Truck Unit Production <br />t24.60 LCY)Hour Adjusted fcarjob efficiency: <br />10142 LCY/flour <br />Optimal Na. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />JOB TIME AND COST <br />Fleet size: 1, Team(s) <br />Unit cost: $2-955 /LCY <br />Total job firne- 13.64 Hours <br />Total job cost: $9,294-79 <br />CIRCES Cost Enitnating Software <br />Return Time.- 0.603 <br />minutes <br />Total Truck Cycle Time: 3.792 <br />minutes <br />Loading Tool unit <br />Production <br />277.78 LCY/Hour Adjusted for job efficiency: <br />230.56 LCYMour <br />Truck Unit Production <br />t24.60 LCY)Hour Adjusted fcarjob efficiency: <br />10142 LCY/flour <br />Optimal Na. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production.- 310.27 <br />LCY/Hour <br />Adjusted single truck/loader team production: 230.56 <br />LC /Hour <br />Adjusted multiple truck/loader team production: 230.56 <br />LC /Hour <br />JOB TIME AND COST <br />Fleet size: 1, Team(s) <br />Unit cost: $2-955 /LCY <br />Total job firne- 13.64 Hours <br />Total job cost: $9,294-79 <br />CIRCES Cost Enitnating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.