Laserfiche WebLink
Pagel of3 <br />Cost Dreakdown: Truck/Loader Team <br />Support E-quipment <br />M aintenance Equipmcnt <br />'1°ruck Excavator <br />Load Area <br />Dump Area <br />I Motor Grader <br />Water Truck <br />%Utilization-machine- 100 100 <br />NA <br />too <br />50 <br />too <br />Ownership cost/hour: 59.28 $37.65 <br />NA <br />$49.19 <br />$18.09 <br />$22,04 <br />Operating cost/hour. $41386 $69.00 <br />NA <br />$117.89 <br />$17.48 <br />$4116 <br />—Ripper op. cost/hour: NA SO.00 <br />NA <br />$0 00 <br />$0-00 <br />$0.00 <br />Operator cost hour: i4,00 $38.67 <br />NA <br />$38.49 <br />$3849 <br />$38,70 <br />Unit Subtotals: $51.14 S145.33 <br />—Units. _3_1 <br />NA <br />$205-56 <br />$74.07 <br />$102.90 <br />Fqumbcr of <br />0 1 <br />1 <br />1 <br />1 <br />Group Subtotals Work., $298:75 <br />_Support: <br />$205.56 <br />Mainc <br />$17697 <br />Total work team costihour: J .211 <br />MATERIAL QUANTITIFS <br />Initial volume: 15,000 CCY <br />Swell factor 1.165 <br />Loose volume: 17,475 LC <br />Source of estimated volume: Division of Reclamation, Mining & Safety; Map 16 <br />Source of estimated swell factor: Eat —Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: SOJ60— <br />HOURLY PRODUCTION <br />Truck CaQjgjW <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 <br />Pounds/LCY <br />Description: Deco <br />!� rapaced rock ®54% Rock, 50% Earth <br />Rated Payload: 27,280 <br />Pounds <br />Payload Capacity: 941 <br />LCD' <br />CIRCES Cost Estimating Software <br />