Laserfiche WebLink
I M7 71- WIT r, <br />Struck Vo <br />a <br />LCY <br />llieoed V Olume: <br />10�00 <br />LCY <br />Average Viatunte <br />9.00 <br />LCY <br />Adjusted Volume, <br />9AI <br />LCY <br />Task # 004 Page 2 of 3 <br />Final Truck Volume Based on Number of Loader Passes: 7.88 LCY <br />Loading Tool Capacity? <br />Rated Capacity: <br />Bucket Fill Factor: <br />Adjusted Capacity: <br />Job Condition CorrectionsL <br />Bucket Si�Kd Class- Medium <br />Site Attitude (ft.)., 4500 feet <br />CIRCES Cost Estimating Softwarc <br />w M <br />Adjusted Loader Cycle Time: 0.321 <br />minutes <br />Net Load Time per Truck: 1.00 <br />minutes <br />Track !CjckeTime, <br />Truck Exchange Time. <br />0.50 Minutes Adjusted for site altitude- <br />0,500 Minutes <br />CIRCES Cost Estimating Softwarc <br />Adjusted Loader Cycle Time: 0.321 <br />minutes <br />Net Load Time per Truck: 1.00 <br />minutes <br />Track !CjckeTime, <br />Truck Exchange Time. <br />0.50 Minutes Adjusted for site altitude- <br />0,500 Minutes <br />Truck Load Time., <br />L063 Minutes Adjusted for site altitude-, <br />1,063 Minutes <br />Truck Maneuver and '' t p Time: <br />0.80 Minutes Adjusted for site attitude: <br />01800 Minutes <br />CIRCES Cost Estimating Softwarc <br />