Laserfiche WebLink
Haul Distance Grade (0/6) Roll. Res Total Res Velocity Travel <br />(Ft) ( % j N Opm) Time <br />(min) <br />MOM OM 1 100 3.00 282 0.635 <br />Haul Time: 0.635 minutes <br />1914 I T-MMI <br />JOB TIME AND COST <br />Fleet size- I Team(s) <br />Unit cost: $1955 ILCY <br />Total job time: 259.21 Hours <br />Total job cost; 5175,912.57 <br />CIRCES Cost Estimating Software <br />Haul Distance <br />minutes <br />Travel <br />minutes <br />Loading Tool unit <br />Time <br />277.78 LCY/Hour Adjusted for; job efficiency-, <br />23056 LCY/Hour <br />Truck Unit Production <br />miti) <br />128J9 LCY/Hour Adjusted for job efficiency. <br />106.40 LCY(Hour <br />Optimat,No. of Trucks. <br />2 Truck(s) Selected Number of Trucks: <br />JOB TIME AND COST <br />Fleet size- I Team(s) <br />Unit cost: $1955 ILCY <br />Total job time: 259.21 Hours <br />Total job cost; 5175,912.57 <br />CIRCES Cost Estimating Software <br />Return Time: 0.550 <br />minutes <br />Total Truck Cycle Time- 3.686 <br />minutes <br />Loading Tool unit <br />Production <br />277.78 LCY/Hour Adjusted for; job efficiency-, <br />23056 LCY/Hour <br />Truck Unit Production <br />128J9 LCY/Hour Adjusted for job efficiency. <br />106.40 LCY(Hour <br />Optimat,No. of Trucks. <br />2 Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 319.19 <br />LCY/Hour <br />Adjusted single truck/loader team production: 230.56 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 230.56 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size- I Team(s) <br />Unit cost: $1955 ILCY <br />Total job time: 259.21 Hours <br />Total job cost; 5175,912.57 <br />CIRCES Cost Estimating Software <br />