Laserfiche WebLink
True oaderWorksheet ont'd <br />Task # 003 Page 2 of T <br />Truck Bed (volumel Basis. <br />Struck Volume: 8.00 <br />- L Y <br />Heaped Volume: 10.00 <br />LCY <br />Average Volume. 4.00 <br />L Y <br />Adjusted Volume: 4A1 <br />LY <br />Final Truck Volume Based 'on Number of loader Fusses: 7.88 LLY <br />Loading T2q ggR#gity <br />Bucket Sire Class: Medium <br />kated Y. <br />Bucket fill Factor- <br />M <br />—Job ® 4 I k <br />Site Altitude (ft.): 4500 feet <br />Adjusted Loader' Cycle Time: 0-367 <br />Net Load. Time per Truck: 1.201 <br />Truck Cycle Time: <br />Truck Exchange e Time 0.50 Minutes Adjusted for site altitudd <br />Truck Load Time: 1.201; Minutes Adjusted for site altitude; <br />Truck Maneuver and Dump Time: 0.80 Minutes Adjusted for site altitude: <br />minutes <br />minutes <br />0.500 Minute <br />1.201 Minutes <br />0.2100 Minutes <br />I CES Cost Esti rriating Software <br />