Laserfiche WebLink
A. COVERAGE UNDER THIS PERMIT (cont.) <br />PART I <br />Permit - Page 5 <br />Permit No. COR- 030000 <br />b) Automatic Coverage: if the applicant does not receive a request for additional information or a notification of <br />denial from the Division dated within ten calendar days of receipt of the application by the Division. authorization to <br />discharge in accordance with the conditions of this permit shall be deemed granted. <br />c) individual Permit Required. III alter evaluation of the application (or additional inlbrmation, such as the SWMP). <br />it is Ibund that this general permit is not appropriate for the operation. then the application will he processed as one <br />for an individual permit. The applicant w ill be notified of the Division's decision to deny certification under this <br />general permit. For an individual permit. additional information may be requested, and 180 days may be required to <br />process the application and issue the permit. At the Division's discretion, temporary coverage under this general <br />permit may he allowed until the individual permit goes into effect. <br />d) General vs. Individual Permit Coverage: Any permittee authorized by this permit may request to be excluded <br />from the coverage of this permit by applying for an individual CDPS permit. The permittee shall submit an <br />individual application. with reasons supporting the request, to the Division at least 180 days prior to any discharge. <br />c) Local Agency Authority: This permit does not pre -empt or supersede the authority of local agencies to prohibit, <br />restrict. or control discharges of stormwater to storm drain sy stems or other water courses within their jurisdiction. <br />6. Inactivation Notice <br />When a site has been tinally stabilized in accordance with the SWMP. the permittee must submit an Inactivation Notice <br />form that is signed in accordance with Part I.F.I. of this permit. The Inactivation Notice form is available from the <br />Division and includes: <br />a) Permit certification number: <br />b) The permittee's name, address, telephone number; <br />c) Name. location. and county for the construction site for which the inactivation notice is being submitted; and <br />d) Certification that the site has been finally stabilized, and a description of the final stabilization method(s). <br />7. 'Transfer of Permit <br />W'hen responsibility for stormwater discharges at a construction site changes from one entity to another. the permittee shall <br />submit a completed Notice of Transfer and Acceptance of Terms form that is signed in accordance with Part I.F.1. of <br />this permit. I'he Notice of Transfer form is available from the Dig ision and includes: <br />a) Permit certification number; <br />b) Name. location, and county for the construction site for which the Notice of Transfer is being submitted; <br />c) Identifying information for the new permittee; <br />d) Identifying information for the current permittee; and <br />e) Effective date of transfer. <br />lithe new responsible party will not complete the transfer form. the permit may be inactivated upon written request to the <br />Di\ ision and completion of the Inactiv anon Notice if the permittee has no legal responsibility, through ownership or <br />contract. for the construction acts sties at the site. In this case. the new owner or operator would be required to obtain <br />permit co\ erage separately . <br />8. Reassignment of Permit <br />Vv'hen a permittee no longer has control of a specific portion of a permitted site, and wishes to transfer co\ erage of that <br />portion of the site to a second party, the permittee shall submit a completed Notice of Reassignment of Permit ('overage <br />form that is signed in accordance with Part I.F.1. of this permit The Notice of Reassignment of Permit Coverage Corm is <br />available from the Division and includes: <br />a) Current permit certification number; <br />b) Identifying information and certification as required by Part I.A.4.b for the new permittee; <br />c) Identify ing information for the current permittee, revised site information and certification for reassignment; and <br />d) Effective date of reassignment. <br />