My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-12_PERMIT FILE - M2011028
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011028
>
2012-03-12_PERMIT FILE - M2011028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:55:04 PM
Creation date
3/16/2012 3:33:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011028
IBM Index Class Name
PERMIT FILE
Doc Date
3/12/2012
Doc Name
RESPONSE TO ADEQUACY REVIEW
From
FOUR CORNERS MATERIALS
To
DRMS
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. COVERAGE I NDI;R 1I IIS PERMIT (cont.) <br />h) Local Agency Authority: This permit does not pre -empt or supersede the authority of local agencies to prohibit, <br />restrict. or control discharges of stormwater to storm drain systems or other water courses within their jurisdiction. <br />c) Permit Coverage Termination: When a site under a Qualifying Local Program has been finally stabilized, <br />coverage under this permit is automatically terminated. <br />d) Compliance with Qualifying Local Program: A construction site operator that has authorization to discharge <br />under this permit under Part 1.A.3 shall comply with the requirements of the Qualifying Local Program with <br />jurisdiction o\er the site. <br />e) Full I'ermit Applicability: The Division may require any operator within the j urisdiction of a Qualifying Local <br />Program coy Bred under this permit to apply. fur and obtain coverage under the full requirements of this permit. "I he <br />operator must be notified in writing that an application for full coverage is required. When a permit certification <br />under this permit is issued to an operator that would otherwise be covered under Part I.A.3 of this permit, the full <br />requirements of this permit replace the requirements as per Part I.A.3 of this permit, upon the effective date of the <br />permit certification. A site brought under the full requirements of this permit must still comply with local <br />stormwater management requirements, policies or guidelines as required by Part I.D.I.g of this permit. <br />4. Application, I)ue Dates <br />PAR 1' <br />Permit - Page 4 <br />Permit No. COR- 030000 <br />a) Application Due Dates: At least ten calendar days prior to the commencement of construction activities. the <br />applicant shall submit an application form as provided by the Division. with a certification that the Stormwater <br />Management Plan (SWMP) is complete. <br />One original completed discharge permit application shall be submitted, by mail or hand delivery, to: <br />Colorado Department of Public Health and Environment <br />Water Quality Control Division <br />WQCD- Permits -B2 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80246 -1530 <br />h) Summary of Application: The application requires. at a minimum. the following: <br />1) The applicant's company name: address; telephone number: and email address (if available); whether the <br />applicant is the owner, developer. or contractor: and local contact information; <br />21 Project name, address, county and location of the construction site, including the latitude and longitude to the <br />nearest 15 seconds of the approximate center of the construction activity; <br />3) Legal description or map (tithe construction site: <br />4) Estimates of the total area of the site, the area of the site that is expected to be disturbed, and the total area of <br />the larger common plan of development or sale to undergo disturbance: <br />5) The nature of the construction activity; <br />6) The anticipated start date and final stabilization date fur the project: <br />7) 1 he name of the receiving water(s), or the municipal separate storm sewer system and the ultimate (i.e.. named) <br />receiving water(s); <br />8) Certification that the SWMP for the construction site is complete (see Part I.C. below): and <br />9) The signature of the applicant. signed in accordance with Part i.F.I of this permit. <br />5. Permit Certification Procedures <br />Ifthis general permit is appropriate for the applicant's operation. then a certification will be developed and the applicant <br />w ill be authorized to discharge stormwater under this general permit. <br />a) Request for Additional Information: The Division shall have up to ten calendar days after receipt of the abo\ e <br />information to request additional data and /or deny the authorization for any particular discharge. Upon receipt of <br />additional information. the Dig ision shall have an additional ten calendar days to issue or deny authorization for <br />the particular discharge. (Notification of denial shall be by letter. in cases where coverage under an alternate general <br />permit or an individual permit is required, instead of coy e age under this permit.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.