Laserfiche WebLink
A. COVERAGE UNDER TIIIS PERMIT (cont.) <br />lithe new responsible party will not complete the reassignment form. the applicable portion of the permitted site may he <br />removed from permit coverage upon written request to the Division lithe permittee has no legal responsibility. through <br />ownership or contract_ for the construction activities at the portion of the site. In this case, the new owner or operator <br />would be required to obtain permit coverage separately. <br />9. Sale of Residence to Homeowners <br />PART 1 <br />Permit - Page 6 <br />Permit No. COR- 030000 <br />For residential construction only, when a residential lot has been conveyed to a homeowner and all criteria in paragraphs <br />a through e. below. are met, coverage under this permit is no longer required and the conveyed lot may be removed from <br />coverage under the permittee's certification. At such time, the permittee is no longer responsible for meeting the terms and <br />conditions of this permit for the con\ eyed lot. including the requirement to transfer or reassign permit coverage. The <br />permittee remains responsible for inactivation of the original certification. <br />a) <br />The lot has been sold to the homeowner(s) for private residential use; <br />b) the lot is less than one acre of disturbed area; <br />c) all construction activity conducted by the permittee on the lot is completed; <br />d) a certificate of occupancy (or equivalent) has been awarded to the home owner; and <br />e) the SWMP has been amended to indicate the lot is no longer covered by permit. <br />Lots not meeting all of the above criteria require continued permit coverage. However, this permit coverage may be <br />transferred (Part I.A.7, above) or reassigned (Part LA.8, above) to a new owner or operator. <br />10, Permit Expiration Date <br />Authorization to discharge under this general permit shall expire on lune 30. 2012. The Division must e\ aluate and <br />reissue this general permit at least once e\ eI \ li\ c years and must recerti f\ the permittee's .authority to discharge under the <br />general permit at such time 'fhcretbre. a permittee desiring continued co\elate under the general permit must reapply h\ <br />March 31. 2012. The Division will initiate the renewal process; howe\er, it is ultimately the permittee's responsibility to <br />ensure that the renewal is submitted. The Division will determine lithe permittee may continue to operate under the terms <br />of the general permit. An individual permit may be required Ior any facility not reauthorized to discharge under the <br />reissued general permit. <br />11. Individual Permit Criteria <br />Various criteria can he used in evaluating whether or not an indi‘ idual (or alternate general) permit is required instead of <br />this general permit I his information may come from the application. SWMP. or additional information as requested by <br />the Di\ isron. and includes. but is not limited to. the following: <br />a) the quality of the receiving waters 1 i.e . the presence of downstream drinking water intakes or a high quality fishery, <br />or for presen ation of high quality eater): <br />b) the size of the construction site: <br />c) evidence of noncompliance under a previous permit for the operation; <br />d) the use of chemicals within the stormwater system; or <br />e) discharges of pollutants of concern to waters for which there is an established Total Maximum Daily Load (TMDL). <br />In addition, an individual permit may be required when the Division has shown or has reason to suspect that the <br />stormwater discharge may contribute to a violation ofa water quality standard. <br />I3. STORMWATER MANAGEMENT PLAN (SWMP)- GENERAL REQUIREMENTS <br />1. A SWMP shall he deg eloped fi each facility covered by this permit. The SWMP shall be prepared in accordance with <br />good engmcering, hydrologic and pollution control practices. ( SWMP need not he prepared by a registered engineer.) <br />