A lime silo is located after the secondary crushers. Lime is applied to the ore passing <br />near the base of the silo using an enclosed variable speed rotary lime feeder. The lime <br />addition rates are governed by the crushed ore conveyor belt scale to maintain a target <br />amount of lime per ton of ore that is crushed and placed on the VLFs. <br />5.6.2 Crushed Ore Conveyor to VLFs <br />After crushing and lime addition, the ore is delivered by conveyor to the LOB, passing by <br />a belt sampler to allow sampling of the ore. The ore is conveyed to the LOB where it is <br />loaded onto haul trucks for delivery to the VLFs. New haul roads will be constructed to <br />connect the LOB and the SGVLF. <br />5.7 Overburden Handling and Control <br />Rock without recoverable gold, but which must be removed to access the gold- bearing ore, is <br />called overburden. Overburden will be loaded from the mine areas for transport to one of two <br />OSAs or to an active backfilling area. The OSAs are designated as the SGOSA and the ECOSA. <br />Both OSAs will be modified as part of MLE2. Additionally, overburden may be utilized for the <br />construction of haul roads and other fills as required as part of the Cresson Project. Overburden <br />will be placed back into several of the mine areas upon completion of mining in those areas. <br />Mine backfilling activities will occur in the Main Cresson, East Cresson, and North Cresson <br />Mine areas. Upon completion of overburden placement, the SGOSA will blend with the <br />backfilled portion of the East and North Cresson Mine areas. Upon completion, the reclaimed <br />ECOSA will blend with backfilled portions of the East Cresson Mine areas. <br />5.7.1 Squaw Gulch Overburden Storage Area ( "SGOSA ") <br />General <br />The SGOSA configuration will change from the design approved as part of MLE. <br />Portions of the approved SGOSA and the approved SGOSA Extension will not be <br />constructed, and the overall footprint will be reduced to enable construction of the <br />SGVLF. Portions of the SGVLF will be underlain by the SGOSA as shown on Drawing <br />C -4a and discussed in Section 7.0 of the Project Description. The southern portion of the <br />existing SGOSA will be modified for use as the platform for construction of the High <br />Grade Mill facilities. A small amount of material which has already been placed in <br />SGOSA will be moved to accommodate mining in the Schist Island area. Material that <br />has been previously approved for placement in the SGOSA will be hauled to the <br />redesigned ECOSA or used in mine area backfilling. <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension 2 <br />5 -17 <br />