My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-28_REVISION - M1980244 (104)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2012-02-28_REVISION - M1980244 (104)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:49:09 PM
Creation date
3/9/2012 9:33:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
2/28/2012
Doc Name
VOL. 1, Exhibit U
From
CRIPPLE CREEK & VICTOR GOLD MINING COMPANY
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 5 -5 <br />Anticipated Equipment List <br />Equipment <br />Specifications <br />Drills <br />Rotary/percussion with 6.75 inch hole diameter / Smaller <br />drill pre -split <br />Rubber Tire / Track Loaders <br />12 to 25 yds bucket capacity <br />Hydraulic Shovels and <br />Loaders <br />18 to 40 yds capacity <br />Haul Trucks <br />85 -ton, 95 -ton, 150 -ton, 240 -ton, and 300 -ton capacity <br />Dozers <br />Caterpillar or equivalent dozers of D9, D10, and D 11 class <br />Trackhoes <br />Caterpillar or equivalent 235 or larger class <br />Water Trucks <br />13,000 and 18,000 capacity <br />Graders <br />Caterpillar or equivalent 16G or larger class <br />Vehicle Maintenance <br />Includes tire trucks, lube trucks, and service trucks <br />Miscellaneous Vehicles <br />Crew vans and bus and various pick -ups <br />Miscellaneous subcontractor -owned earth moving equipment and maintenance equipment <br />may be on site at various times and in varying numbers during the development of <br />MLE2. For MLE2, contractor activity would be utilized for utility support; construction <br />of the SGVLF, SGADR, and High Grade Mill facilities; growth medium salvage; growth <br />medium replacement during reclamation; and equipment maintenance as needed. <br />5.4.4 Drilling and Blasting <br />Overburden and ore will be drilled using track mounted drills. Individual drill pattern <br />spacing and depths may vary. The spacing will be determined by rock characteristics as <br />mining progresses and will change accordingly. Holes usually will be over drilled by <br />approximately five feet to accommodate typical bench heights. If bench heights vary, the <br />depth of the drill holes will also vary. Drill holes for blasting will be sampled and <br />assayed to confirm ore from overburden material. <br />Higher grade ore material will be closely mapped in each mine area and blasting will <br />occur to selectively blast the higher grade ore zones separately. The higher grade ore <br />material will be stockpiled in the mine areas and fed in weekly batches through the <br />crushing facilities, separated from other ore crushing. <br />After drilling, the blast holes will be loaded with detonators and boosters. The blasting <br />agent will be ammonium nitrate fuel oil ( "ANFO ") or emulsified ANFO, which will be <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension 2 <br />5 -12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.