My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-28_REVISION - M1980244 (104)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2012-02-28_REVISION - M1980244 (104)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:49:09 PM
Creation date
3/9/2012 9:33:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
2/28/2012
Doc Name
VOL. 1, Exhibit U
From
CRIPPLE CREEK & VICTOR GOLD MINING COMPANY
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
loaded into the drill holes directly from a truck. The fuel oil is typically diesel fuel. <br />CC &V uses an explosives contractor, Buckley Powder, for mixing and delivering product <br />agents to the mining area. The products are then used to manufacture the blasting <br />products at the site by the explosives contractor (see Drawing C -4 for location of <br />explosives storage area). The blasting agents will be mixed on site just prior to <br />placement into the drill hole by Buckley Powder. The explosive agents will then be <br />detonated by trained and qualified CC &V personnel. The amount of explosive placed in <br />each drill hole depends on the rock characteristics. The loaded holes will be detonated in <br />groups with one group separated from another by an appropriate timing delay. The <br />materials, charges, pattern or spacing, and timing of blasting will be dictated by the type <br />of rock, the size requirements of the ore, the mining equipment, the geology and rock <br />mechanics, characteristics of the mine layout, issued air permits, and the need to control <br />the offsite vibration effect of each production blast. <br />Blasting for MLE2 will be conducted as currently approved by OMLR. CC &V re- <br />evaluated this method for use in MLE2 development. The results of these re- evaluations <br />continue to indicate that in order to maintain a peak particle velocity ( "ppv ") below the <br />approved standard of 0.5 inches per second ( "ips ") for sensitive historic structures, the <br />recommended scaled distance is 43.8 for the North Cresson Mine area, 34.2 for the Main <br />Cresson Mine area, 34 for the East Cresson Mine area, and 47.7 for the South Cresson <br />portion of the Main Cresson Mine area. CC &V will adhere to the recommendations of <br />these reports. Each re- evaluation has confirmed that the monitoring plan is sufficient and <br />the ongoing monitoring has confirmed no structural damage to surrounding structures <br />should occur from blasting activities at the Cresson Project. Matheson Mining <br />Consultants has compiled a summary of the blasting monitoring program evaluations and <br />results. That summary is included in Appendix 5 in Volume III. <br />Existing monitoring has verified blasting projections, and operations under MLE2 will <br />not negatively impact neighboring communities. CC &V has two existing blast monitors <br />in the City of Victor, one in the unincorporated area of Goldfield, and will install an <br />additional permanent monitor near the City of Cripple Creek in an appropriate location <br />when mining activities commence in the North Cresson Mine area. These monitors will <br />continue to be operated for the Cresson Project unless a specific request is made to the <br />OMLR to halt monitoring at any location. <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension 2 <br />5 -13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.