Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 056 Page 2 of <br />Struck Volume: <br />8.00 <br />LCY <br />Heaped Volume: <br />10.00 <br />LCY <br />Average Volume: <br />9.00 <br />LCY <br />Adjusted Volume: <br />10.00 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes: 8.33 LCY <br />Loading Tool Capacity <br />Rated Capacity: 2.250 LCY <br />Bucket Fill Factor. 0.925 Loos <br />Adjusted Capacity: 2.081 LCY <br />Job Condition Corrections: <br />Bucket Size Class: Medium <br />0.925 <br />Site Altitude (ft.): 4500 feet <br />Net Correction: ( 0.838 1 0.830 1 <br />Loading Tool Cock Time: Number of Loading Toot Passes Required to Fill Tmck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: BELOW AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load. dump. maneuver): <br />4 <br />0.100 <br />Passes <br />NA minutes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Ad': <br />1 1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency, <br />1 0.830 <br />0.830 <br />(CAT HB <br />Net Correction: ( 0.838 1 0.830 1 <br />Loading Tool Cock Time: Number of Loading Toot Passes Required to Fill Tmck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: BELOW AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load. dump. maneuver): <br />4 <br />0.100 <br />Passes <br />NA minutes <br />Cycle Time Factors <br />0.500 <br />Factor min.) <br />Source <br />Material: <br />NA <br />NA <br />Cat HB) <br />Stockpile: <br />NA <br />NA <br />Cat HB <br />Truck Ownership- <br />NA <br />NA <br />(Cat HB) <br />Operation: <br />NA <br />NA <br />Cat HB) <br />Dump Target: <br />I NA <br />NA <br />Cat HB) <br />Net Uycte -1 rme Adjustment: NA mrnutes <br />Adjusted Loader Cycle Time: 0.367 minutes <br />Net Load Time per Truck: 1201 minutes <br />Truck Cycle Time: <br />Truck Exchange Time: 0.50 Minutes <br />Truck Load Time: 1.201 Minutes <br />Truck Maneuver and Dump Time: 0.80 Minutes <br />Adjusted for site altitude: <br />0.500 <br />Minutes <br />Adjusted for site altitude: <br />1.201 <br />Minutes <br />Adjusted for site altitude: <br />0.800 <br />Minutes <br />CtRCES Cost Estimating Softwam <br />Permit Application 3.02 -43 01/23/2012 <br />