My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-07_PERMIT FILE - C2010088A (19)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010088A
>
2012-03-07_PERMIT FILE - C2010088A (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:54:50 PM
Creation date
3/8/2012 8:14:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088A
IBM Index Class Name
Permit File
Doc Date
3/7/2012
Doc Name
Performance Bond Requirements
Section_Exhibit Name
Section 3.02
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tmck/Loader Worksheet Cont'd Task # 056 Page 3 of 3 <br />Truck Travel (Haul & Return) Time: <br />maintained 3.0 <br />MAid R^sttP! <br />Road Condition. Firm. smooth, rolling dirtllt surfaced. watered <br />Seg # <br />Had Distance Grade (° /D) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Truck Unit Production <br />(Ft) <br />( %) <br />{ %o) <br />(fpm) <br />Ti m <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />1 i 900.00 <br />1 0.00 <br />3.00 <br />1 <br />900.00 0.00 <br />3.00 3.00 <br />2824 <br />0.422 <br />Haul Time: 0.422 minutes <br />Return Route⢠<br />Seg # Haul Distance <br />Grade (° /a) <br />Roll. Res <br />Total Res <br />Velocity I Travel <br />(Ft) <br />Truck Unit Production <br />(° /p) <br />M <br />(fpm) Time <br />152.99 LCY/Hour Adjusted for job efficiency: <br />126.98 LCY/Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />1 i 900.00 <br />1 0.00 <br />3.00 <br />3.00 <br />2874 3 0.342 <br />Return Time: 0.342 minutes <br />Total Truck Cycle Time: 3.255 minutes <br />Loading Tool unit <br />Production <br />293.65 LCY/Hour Adjusted for job efficiency: <br />243.73 LCY/Hour <br />Truck Unit Production <br />152.99 LCY/Hour Adjusted for job efficiency: <br />126.98 LCY/Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 380.94 <br />_ LCY/Hour <br />Adjusted single truck/loader team production; 343.73 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 243.73 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: i Team(s) <br />Unit cost: 52.795 /LCY <br />Total job time: 27.23 Hours <br />Total job cost: $18,553.29 <br />CiRCES Cast Estimating Software <br />Permit Application 3.02 -44 01/23/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.