My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-07_PERMIT FILE - C2010088A (19)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010088A
>
2012-03-07_PERMIT FILE - C2010088A (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:54:50 PM
Creation date
3/8/2012 8:14:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088A
IBM Index Class Name
Permit File
Doc Date
3/7/2012
Doc Name
Performance Bond Requirements
Section_Exhibit Name
Section 3.02
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br />TRUCK/LOADER TEAM WORK <br />Task description: Replace Topsoil from Stockpile 2 to Rang Loop _ <br />Site: Frulta i oadout Permit Action: New Permit Permit/Job #: C2010088 <br />PROJECT IDENTIFICATION <br />Task #: 056 State: Colorado Abbreviation: Norte <br />Date: 30- Aug -11 County: Mesa Filename: _ C088 -056 <br />User: JR5 ,� <br />Agency or organization name: DRMS <br />HOURLY EOtiIP'MENT COST <br />Truck Loader Team - Truck: I Generic 8 -10 c , 6x4 <br />- Loader Cat 330C L <br />Suvoort Equipment -Load Area: I NA <br />Road Maintenance —Motor Grader: I CAT 12H <br />-Water Truck Water Tanker, 5,000 Gal. <br />[_not Rrpnttdawnt TniakltnaderTeam <br />Shin basis: 1I yar, da_y <br />Sunnnrt Fnuinment Maintenance Pnuinment <br />Truck <br />a <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />100 <br />50 <br />100 <br />Ownership cost/hour. <br />Operating cost /hour: <br />$9.28 <br />$37.65 <br />NA <br />$49.19 <br />$18.09 <br />$22.04 <br />$41.86 <br />$69.00 <br />NA <br />$117.89 <br />517.48 <br />$42.16 <br />Ripper op. cost/hour: <br />NA <br />SO.00 <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$0.00 <br />$38.67 <br />NA <br />$38.49 <br />$38.49 <br />$38.70 <br />Unit Subtotals: <br />$Sl.l4 <br />$145.33 <br />NA <br />$205.56 <br />$74.07 <br />1 <br />$102.90 <br />Number of Units: <br />3 <br />1 <br />1 0 <br />i <br />1 ; <br />Group Subtotals: Work: $298.75 <br />Support: 5205.56 <br />Maint: $17(x.97 <br />Total work team costs tour: $681,28 <br />MATERIAL OUANTITIES <br />Initial volume: 5,900 CCY Swell factor: 1.125 <br />Loose volume: 6,538 LCY <br />Source of estimated volume: Operator Estimate; Maps 9 and 16 <br />Source of estimated swell factor. Cat Handbook <br />Material Purchase Cost: SOA0 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (wei t) Basis: <br />Material weight: 2,650 PoundsiLCY <br />Description: _ _Decomposed rock - 251% Rock, 75% Earth <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 10.29 LCY <br />CIRCIES Cost EAima ing Software <br />Permit Application 3.02 -42 01/23/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.