Laserfiche WebLink
Truck/Loader Workshect Cont'd Task # 055 Page 3 of 3 <br />Truck Travel (Haul & Return) Time: <br />nudntained 3.0 <br />14-1 ID—f— <br />Seg # <br />Haul Distance <br />Grade ( °/a) <br />Roll. Res <br />Total Res � Velocity <br />Travel <br />Total Truck Cycle Time: 3A76 <br />(Ft) <br />Loading Tool unit <br />(°!o) <br />( %) (fpm) <br />Time <br />im <br />Production <br />293.65 <br />LCY/Hour Adjusted for job efficiency: <br />243.73 LCY/Hour <br />Truck Unit Production <br />min <br />1 <br />1200.00 <br />0.00 <br />3.00 <br />3.00 282a <br />0.529 <br />Haul Time: 0.529 minutes <br />Rwhnm Rnute- <br />Seg # <br />Haul Distance <br />Grade ( °k) <br />Roll. Res Total Res <br />Velocity <br />Trave <br />Total Truck Cycle Time: 3A76 <br />(Ft) <br />Loading Tool unit <br />(b /q) (0 /O) <br />(ipm) <br />Time <br />Production <br />293.65 <br />LCY/Hour Adjusted for job efficiency: <br />243.73 LCY/Hour <br />Truck Unit Production <br />min <br />l <br />1200.00 <br />0.00 <br />1 3.00 3.00 <br />2874 <br />0.446 <br />CIPCt'S Cats Estimating Software <br />Permit Application 3.02 -41 01/2312012 <br />Return Time: 4.446 <br />minutes <br />Total Truck Cycle Time: 3A76 <br />minutes <br />Loading Tool unit <br />Production <br />293.65 <br />LCY/Hour Adjusted for job efficiency: <br />243.73 LCY/Hour <br />Truck Unit Production <br />143.70 <br />LCY/Hour Adjusted for job efficiency: <br />119.27 LCY/Hour <br />Optimal, No. of Trucks: <br />2 <br />Truok(s) Selected Number of Trucks: <br />3 Trucks) <br />Adjusted hourly truck team production: 337.81 <br />LCY/Hour <br />Adjusted single truckfloader team production. 24173 <br />LCY/liour <br />Adjusted multiple trucktloader team production: 243.73 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />l <br />Team(s) Total job time: 22.16 <br />Hours <br />Unit cost: <br />$2.795 <br />tLC:Y Total job cost: $15,494.20 <br />CIPCt'S Cats Estimating Software <br />Permit Application 3.02 -41 01/2312012 <br />