Laserfiche WebLink
Snowcap Coal Company, Inc. <br />- 10 - 2011 Annual Reclamation Report <br />South, Range 98 West, 6 P.M. <br />Area - 0.5 acres <br />Date - October 2011 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />30. Roadside South Portal Road to Old Upper Diversion Ditch and Water <br />Tank (Light Use Road #1) - Portions of Light Use Road #1, as approved <br />by PR -3, was graded to approximate original contours and seeded. <br />Located in the SE'/ Section 34, Township 10 South, Range 98 West, 6th <br />P.M. <br />Area - 1.9 acres <br />Date - September 2007 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />31. Railroad Loop Track (South of 1 9/10 Road) - The Railroad Loop Track <br />that lies south of 1 9/10 Road was removed, regraded, backfilled and <br />seeded. This area was part of the 2.1 acres that achieved final Phase Ill <br />Bond Release with SL -5, approved on November 5, 2009. Located in the <br />NW'/ Section 34, Township 10 South, Range 98 West, 6 P.M. <br />Area - 0.3 acres <br />Date - January 2009 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Lowland Components <br />Phase Ill Bond Release - 0.3 acres <br />32. Cameo Refuse Disposal Area No. 1 (Road) - The "access" road (1.2 <br />acres) to Cameo Refuse Disposal Area No. 1 that had been left open for <br />coal fines clean up was regraded and backfilled to approved final contours <br />and seeded. Located in the SE'/ Section 28, Township 10 South, Range <br />98 West, 6 P.M. <br />Area - 1.2 Acres <br />Date - September 2010 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />33. Unit Train Load -out and Railroad Loop Track/Conveyor Corridor - <br />Portions of the Unit Train Load -out and Railroad Loop Track/Conveyor <br />Corridor where reclaimed as per approved Permit Revision #4 (PR -4). <br />38.1 acres were backfilled and graded during 2010. 0.9 acres, which <br />includes reclaimed Ponds 1 and 2, footprint of Topsoil Pile #4, and small <br />area where coal fines where removed, was seeded. The entire 67.6 acres <br />at this area achieved final Phase III Bond Release with SL -7 which was <br />approved on April 26, 2011. Located in Sections 26, 27 & 34 Township 10 <br />South, Range 98 West, 6 P.M. <br />Area - 38.1 acres reclaimed, 0.9 acres seeded <br />Date - June & September 2010 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Lowland Components <br />Phase Ill Bond Release - 67.6 acres <br />