Laserfiche WebLink
Snowcap Coal Company, Inc. <br />-11 - 2011 Annual Reclamation Report <br />2. Vegetation Studies - Field work for vegetation studies was performed by Cedar <br />Creek Associates on June 6 - 9, 2011 and August 5, 2011. Sampling was <br />conducted at areas that had been reclaimed and seeded in 2002 or earlier in <br />order for "Year 9" evaluation to be performed. Sampling was also conducted at <br />four areas that require a "Year 4" vegetation cover evaluation be performed. The <br />Revegetation Evaluation Reports have not yet been received by Snowcap, but <br />will be sent to DRMS under separate cover upon receipt. <br />3. Other -On April 26, 2011, Bond Release Application No. 7 (SL -7 - Final Phase I, <br />II and III Bond Release) was approved by DRMS. This action released Snowcap <br />Coal Company from all liability for reclamation work at the Unit Train Loadout, <br />Railroad Loop, Conveyor Corridor and Permanent Flood Control Dike areas (see <br />Nos. 2, 26 & 33 above). <br />