My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-14_REPORT - C1981041 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2012-02-14_REPORT - C1981041 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:48:38 PM
Creation date
2/15/2012 1:21:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
REPORT
Doc Date
2/14/2012
Doc Name
2011 Annual Reclamation Report
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Email Name
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. <br />- 9 - 2011 Annual Reclamation Report <br />2011. Located in SE' /, Section 27 and NW' /, Section 34, Township 10 <br />South, Range 98 West, 6 P.M. <br />Area - 2.7 acres <br />Date - July 2003 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Lowland Components <br />Phase Ill Bond Release - 2.7 acres <br />27. Conveyor Corridor - The conveyor corridor, from the Xcel culvert south <br />to Transfer Building #2 and east of Colorado River where conveyor tube <br />crossed river was graded to approximate original contours and seeded. A <br />total of 1.3 acres in this area achieved final Phase Ill Bond Release with <br />SL -5, approved on November 5, 2009. Located in SE'/, Section 27 and <br />NW'/, Section 34, Township 10 South, Range 98 West, 6 P.M. <br />Area - 1.6 acres <br />Date - March 2004 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Lowland Components <br />Phase Ill Bond Release - 1.3 acres <br />28. Substations A - Superstructures, fences, slabs and components <br />removed during 2007. Graded to approximate original contours and re- <br />seeded. Located in the SE% Section 34, Township 10 South, Range 98 <br />West, 6 P.M. <br />Area - 0.2 acres <br />Date - August 2007 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />29. Roadside South Portal Mine Facilities and Stockpile /Prep Plant Area <br />and Conveyor Tunnel Under 1 -70 - The Roadside South Portal Mine <br />Facilities, Stockpile and Prep Plant areas where reclaimed as per <br />approved Permit Revision #3 (PR -3). 13.5 acres were reclaimed during <br />the last two quarters of 2007. These acres include all back filled and <br />graded areas along with buildings and asphalt areas that were approved <br />for retention through PR -3. The east end of the Conveyor Tunnel was <br />backfilled and filled with a 2 foot concrete plug. Due to inclement weather <br />and frozen soils, seeding was postponed until the 1s quarter of 2008. <br />These 13.5 acres achieved final Phase Ill Bond Release with SL -6 which <br />was approved on December 14, 2010. Located in the SW' & SE' <br />Section 34, Township 10 South, Range 98 West, 6 P.M. <br />Area - 13.5 acres reclaimed <br />9.6 acres backfilled and graded <br />6.4 acres top soiled <br />Date - December 2007 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />Phase Ill Bond Release - 13.5 acres <br />Pond 8 and surrounding area was backfilled, graded to final contours and <br />seeded in 2011. Located in the SW'/ & SE'/ Section 34, Township 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.