• Technical Revision (TR -23) was submitted on August 9, 1995 and withdrawn on <br />October 5, 1995. <br />• Technical Revision (TR -24) was submitted on August 24, 1995 and presented the <br />Phase III design for Pond 006. Decision —to- Approve was issued on October 2, 1999. <br />• Technical Revision (TR -25) was submitted on April 26, 1996 and presented revisions <br />to the post - mining topography and the reclaimed drainage channels. Decision —to- <br />Approve was issued on August 26, 1996. <br />• Technical revision (TR -26) was submitted on June 18, 1996 and addressed the woody <br />plant density standards. Decision —to- Approve was issued on August 16, 1996. <br />• Technical Revision (TR -27) was submitted on June 23, 1997 and presented a <br />remedial action plan for repairing the landslide near sediment Pond 006 and Haul <br />Road A. Decision —to- Approve was issued on July 23, 1997. <br />• Technical Revision (TR -28) was submitted on September 29, 1997 and modified the <br />postmining topography in the 006 Gulch along the southwest cropline in the A Pit. <br />Decision —to- Approve was issued on November 3, 1997. <br />• Technical Revision (TR -29) was submitted on December 8, 1997 and addressed <br />Stipulation #25 and provided the Phase IV design for Pond 006. Decision —to- <br />Approve was issued on March 13, 1998. <br />• Technical Revision (TR -30) was submitted on May 8, 1998 and provided several <br />revised and new reclaimed drainage channel designs and profiles. Decision —to- <br />Approve was issued on September 3, 1998. <br />• Technical Revision (TR -31) was submitted on June 11, 1998 and presented design <br />information for Haul Road H and indicated the removal of diversion ditches 5 and 8. <br />Decision —to- Approve was issued on August 14, 1998. <br />• Permit Revision (PR -02) was submitted on September 15, 1998 and addressed mining <br />and reclamation plans for the II -W South Extension area. Decision—to-Approve was <br />issued on November 4, 1999. <br />• Technical Revision (TR -32) was submitted on December 10, 1998 and provided <br />responses to adequacy comments for the Mid -Term review. Decision —to- Approve <br />was issued on February 25, 1999. <br />PR -05 5 05/05 <br />