My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-06_PERMIT FILE - C1982057 (12)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982057
>
2012-01-06_PERMIT FILE - C1982057 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:12 PM
Creation date
2/13/2012 9:32:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
1/6/2012
Section_Exhibit Name
Tab 01 Permit Summary
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Technical Revision (TR -13) was submitted on September 13, 1991 and contained as- <br />built certifications for Haul Road F and the Mine Entrance Haul Road. Decision —to- <br />Approve was issued on November 1, 1991. <br />• Technical Revision (TR -14) was submitted on December 16, 1991 and contained <br />sediment pond 006 as -built certification. Decision —to- Approve was issued on <br />February 11, 1992. <br />• Technical Revision (TR -15) was submitted on January 10, 1992 and presented a <br />design change for sediment Pond 009. Decision —to- Approve was issued on April 28, <br />1992. <br />• Technical Revision (TR -16) was submitted on March 17, 1992 and provided a <br />stability analysis for Haul Road G and pond 005. Decision—to-Approve was issued <br />on May 18, 1992. <br />• Technical Revision (TR -17) was submitted on July 20, 1992 and provided the as -built <br />certification for Pond 009. Decision —to- Approve was issued on October 23, 1992. <br />• Technical Revision (TR -18) was submitted on July 27, 1992 and addressed the <br />change in location of Culvert F -3. Decision —to- Approve was issued on April 7, 1993. <br />• Technical Revision (TR -19) was submitted on August 18, 1992 and provided the as- <br />built certification for Pond 005. Decision —to- Approve was issued on November 16, <br />1992. <br />• Technical Revision (TR -20) was submitted on October 7, 1992 and provided the as- <br />built certification for Haul Road G. Decision —to- Approve was issued on November <br />16, 1992. <br />• Technical Revision (TR -21) was submitted on October 13, 1993 and was in response <br />to the Midterm Review. Decision —to- Approve was issued on February 17, 1994. <br />• Transfer of Surface Mine Permit was submitted June 28, 1994 and Decision -to- <br />Approve was issued on November 22, 1994. <br />• Permit Renewal (RN -02) was submitted June 28, 1995 and Decision—to-Approve was <br />issued on April 11, 1996. <br />• Technical Revision (TR -22) was submitted on June 9, 1995 and contained <br />modifications to the haul road drainage control. Decision —to- Approve was issued on <br />July 14, 1995. <br />PR -05 4 05/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.