My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-06_PERMIT FILE - C1982057 (12)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982057
>
2012-01-06_PERMIT FILE - C1982057 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:12 PM
Creation date
2/13/2012 9:32:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
1/6/2012
Section_Exhibit Name
Tab 01 Permit Summary
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Technical Revision (TR -33) was submitted June 8, 1999 and presented the <br />development activities for the II -W South Extension. Decision —to- Approve was <br />issued on July 8, 1999. <br />• Technical Revision (TR -34) was submitted on April 14, 2000 and presented a revised <br />mine plan to include auger mining. Decision —to- Approve was issued on May 17, <br />2000. <br />• Technical Revision (TR -35) was submitted on April 19, 2000 and added 64 acres to <br />the disturbed area. Decision —to- Approve was issued on June 29, 2000. <br />• Technical Revision (TR -36) was submitted on May 15, 2000 and provided the as- <br />built certification for Haul Road H. Decision—to-Approve was issued on July 6, 2001. <br />• Permit Renewal (RN -03) was submitted on June 23, 2000 and the Decision -to- <br />Approve was issued on June 15, 2001. <br />• Technical Revision (TR -37) was submitted on April 30, 2001 and presented the <br />design for Haul Road L. Decision —to- Approve was issued on July 2, 2001 <br />• Technical Revision (TR -38) was submitted on June 28, 2001 and provided the. as- <br />built certification for Pond 016. Decision —to- Approve was issued on July 30, 2001. <br />• Technical Revision (TR -39) was submitted on June 28, 2001 and provided the as- <br />built certification for Haul Road I. Decision —to- Approve was issued on July 30, <br />2001. <br />• Technical Revision (TR -40) was submitted on July 30, 2001 and contained an increase <br />of 10.5 acres of topsoil removal. Decision —to- Approve was issued on October 2, <br />2001. <br />• Permit Revision (PR -03) was submitted on February 4, 2002 and contained additional <br />disturbance for mining, reclamation and related operations. Decision -to- Approve was <br />issued on May 1, 2003. <br />• Technical Revision (TR -41) was submitted on September 12, 2002 and presented a <br />revised design for Pond 017. Decision -to- Approve was issued on October 4, 2002. <br />• Technical Revision (TR -42) was submitted on February 3, 2003 and included a <br />permanent and interim design for the Oil Well access road, the location of two <br />additional culverts in the disturbed area, and the addition of access disturbance area at <br />Ponds 016 and 017. Decision -to- Approve was issued on October 14, 2003. <br />PR -05 6 05/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.