Laserfiche WebLink
Note: ** DRMS Direct Cost Total should be 85$ 7,013 rather than $857,103 as shown on the <br />Cost Summary Form for the 2010 Midterm. <br />PR -01 Revised 7,12011 <br />Drill Seed Mix #5 on TAHR <br />$7,04 <br />Drill Seed Cropland on TAHR <br />$6,57 <br />037 <br />Demolish and Remove Structures <br />$521,464 <br />040 <br />Clean Sediment from Ponds Once During Liability Period <br />$3,179 <br />041 <br />Site Maintenance <br />$10,335 <br />045 <br />Mob /Demob — Combined Tasks 045, 046, 047 <br />$8,041 <br />Subtotals <br />$857,013 <br />$203,419 <br />Total Direct Cost <br />$1,060,432 <br />Indirect Costs <br />Liability Insurance - 2.02% of direct <br />$21,421 <br />Performance Bond - 1.05% of direct <br />$11,135 <br />job Superintendent — 588.34 hrs @ $52.10 /hour <br />$30,653 <br />Profit - 10% of direct <br />$106,043 <br />Total O &P <br />$169,252 <br />Contract Amount (direct + O &P) <br />$1,229,684 <br />Engineering /bid preparation — 4.25% of contract <br />$52,262 <br />Reclamation Management - 3.25% of contract <br />$39,965 <br />Total Amount (direct + indirect) <br />$1,321,911 <br />Note: ** DRMS Direct Cost Total should be 85$ 7,013 rather than $857,103 as shown on the <br />Cost Summary Form for the 2010 Midterm. <br />PR -01 Revised 7,12011 <br />