Laserfiche WebLink
HAYDEN GULCH LOADOUT <br />COST SUMMARY <br />(Based on HGL 2010 Midterm and Seneca II -W SL-02 Bond Release) <br />Direct Costs <br />Task <br />No. <br />Task Description <br />HGT <br />Bond Cost <br />II -W <br />Transferred <br />Bond Cost <br />001 <br />Regrade Rail Loop <br />$43,514 <br />002 <br />Regrade Rail Spur <br />$30,627 <br />003 <br />Regrade Facilities Area <br />$16,888 <br />006 <br />Rip Facilities Area <br />$4,020 <br />007 <br />Rip Haul Roads <br />$992 <br />008 <br />Rip Ramp Roads <br />$819 <br />Rip TAHR <br />$9,85 <br />011 <br />Regrade Haul Roads <br />$2,815 <br />012 <br />Regrade Ramp Roads <br />$2,064 <br />Regrade TAHR <br />$2,191 <br />015 <br />Finish Grade Disturbed Area <br />$9,434 <br />018 <br />Regrade Truck Loop Pond <br />$469 <br />019 <br />Regrade Rail Loop Pond <br />$1,568 <br />020 <br />Regrade All Ditches <br />$4,601 <br />021 <br />Regrade Leach Field <br />$1,877 <br />024 <br />Replace Topsoil on Rail Loop and Facilities Area <br />$79,154 <br />025 <br />Replace Topsoil on Rail Spur <br />$14,788 <br />Replace Topsoil on TAHR <br />P <br />$156,54 <br />028 <br />Seal Alluvial Wells HGDAL -1, -2 and -3 <br />$373 <br />031 <br />Drill Seed Mix #1 <br />$49,678 <br />Drill Seed Mix #1 - TAHR <br />$21,20 <br />032 <br />Drill Seed Mix #2 <br />$1,807 <br />033 <br />Drill Seed Mix #3 <br />$45,388 <br />034 <br />Hydroseed Mix #3 <br />$3,171 <br />PR -01 Revised 712011 <br />