My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-28_PERMIT FILE - C1992081A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081A
>
2011-11-28_PERMIT FILE - C1992081A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:24 PM
Creation date
1/25/2012 10:58:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
11/28/2011
Doc Name
Railcar Loadout Operations Plan Reclamtion Liability Estimate (Existing and On-the-Ground)
Section_Exhibit Name
Tab 23 Attachment 23-2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 23 -2 <br />COAL LOADOUT OPERATIONS PLAN RECLAMATION LIABILITY ESTIMATE <br />Introduction <br />This section provides a reclamation cost estimate for the coal loadout <br />operations plan, which is the original operational plan for the Hayden Gulch <br />Loadout, and which is the existing and on- the - ground conditions for the <br />facility area. The only difference in the reclamation activities between the <br />coal loadout operational plan and the coal load -in operational plan is the <br />building configuration in the facilities area. Consequently, most direct <br />costs calculated by CDRMS as part of the RN -03 liability estimate are <br />applicable. <br />The coal loadout operations reclamation cost estimate was calculated as <br />follows: <br />Direct Costs <br />• Backfilling and rough grading - CDRMS costs, dated May 2008 <br />• Ripping - CDRMS costs, dated May 2008 <br />• Road reclamation - CDRMS costs, dated May 2008 <br />• Finish grading - CDRMS costs, dated May 2008 <br />• Drainage control system removal - CDRMS costs, dated May 2008 <br />• Topsoil replacement - CDRMS costs, dated May 2008 <br />• Borehole sealing - CDRMS costs, dated May 2008 <br />• Building demolition - calculated by HGTI based on the list of <br />buildings (and dimensions) presented in Table 12 -1.2, and unit costs <br />for Task 037 determined by CDRMS in the RN -03 liability estimate. <br />The temporary office building demolition costs calculated for MR -15 <br />have been incorporated into this estimate. The miscellaneous costs <br />identified by CDRMS in the 2007 Coal Bond Compliance Inspection (MR- <br />16) have been incorporated into this estimate. <br />• Miscellaneous reclamation - CDRMS costs, dated May 2008 <br />• Equipment mobilization /demobization - CDRMS costs, dated May 2008 <br />Indirect Costs <br />• Overhead and Profit - calculated by HGTI based on the coal loadout <br />operational plan direct costs using multipliers provided in Tab 23. <br />RN -03 23 -2.1 Revised 06/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.