Laserfiche WebLink
Task description: <br />Site: Weimer No. 2 <br />PROJECT IDENTIFICATION <br />Task #: 001 <br />Date: 1/4/2012 <br />User: GRM <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $199.86 <br />Total Fleet Cost/Hour: $199.86 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />280 <br />1.090 <br />305 LCY <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Average push gradient: <br />Average site altitude: <br />Cut and fill final highwalls <br />Agency or organization name: DRMS <br />Cat D8T - 8SU <br />310 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />$58.56 <br />$102.81 <br />$0.00 <br />$38.49 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />50 feet <br />1,400.0 LCY /hr <br />Materials consistency description: Com acted fill or embankment 0.9 <br />-15 % <br />5,800 feet <br />Material weight: 2,400 lbs /LCY <br />Weight description: Clay and gravel - Dry <br />BULLDOZER WORK <br />Permit Action: 2012 update <br />State: Colorado <br />County: Montrose <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Abbreviation: None <br />Page 1 of 2 <br />Permit/Job #: M1996031 <br />Filename: M031 -001 <br />CIRCES Cost Estimating Software <br />