My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-04_REVISION - M1996031
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1996031
>
2012-01-04_REVISION - M1996031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:25 AM
Creation date
1/11/2012 2:17:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996031
IBM Index Class Name
REVISION
Doc Date
1/4/2012
Doc Name
Cost Summary
From
DRMS
To
File
Type & Sequence
SI1
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0.750 <br />(AVG.) <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />1.329 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.958 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Bulldozer Worksheet Cont'd <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Net correction: 0.5706 <br />Adjusted unit production: 798.84 LCY /hr <br />Adjusted fleet production: 798.84 LCY /hr <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />Total job time: <br />Total job cost: <br />1 Dozer(s) <br />$0.250 /LCY <br />0.38 Hours <br />$76.36 <br />Task # 001 <br />Source <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.