Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />cut and fill final highwalls <br />DOZER <br />0.38 <br />$76.36 <br />002 <br />rip pit floor fpr topsoil placement <br />RIPPER <br />12.09 <br />$2,576.00 <br />004 <br />initial seeding with clover <br />REVEGE <br />24.00 <br />$5,626.07 <br />005 <br />reveg of site <br />REVEGE <br />24.00 <br />$7,907.82 <br />006 <br />mobilization to site <br />MOBILIZE <br />2.57 <br />$1,806.34 <br />03a <br />finish topsoil placement <br />DOZER <br />6.41 <br />$1,281.94 <br />SUBTOTALS: <br />69.45 <br />$ $19,274.53 <br />Task description: <br />Site: Weimer No. 2 <br />PROJECT IDENTIFICATION <br />Task #: 000 <br />Date: 1/4/2012 <br />User: GRM <br />Agency or organization name: <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />COST SUMMARY <br />Permit Action: 2012 update <br />State: Colorado <br />County: Montrose <br />DRMS <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />2.02 Total = <br />1.05 Total = <br />0.00 Total = <br />10.00 Total = <br />TOTAL 0 & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />500.00 <br />0.00 <br />5.00 <br />CONTINGENCY: 3.00 <br />Permit/Job #: M1996031 <br />Abbreviation: None <br />Filename: M031 -000 <br />Total = <br />Total = <br />$389.35 <br />$202.38 <br />$0.00 <br />$1,927.45 <br />$2,519.18 <br />$21,793.71 <br />500.00 <br />$0.00 <br />$1,089.69 <br />6vt <br />Total = $578.24 <br />TOTAL INDIRECT COST = $4,687.10 <br />TOTAL BOND AMOUNT (direct + indirect) = $23,961 <br />