Laserfiche WebLink
o <br />Z <br />w o <br />0_ co <br />1 <br />OVERBURDEN �� 4 <br />.•rr iettAX02S. <br />SAND/GRAVEL . . <br />itslitilit 'a, <br />rsstto, <br />r .iYr`iij`ii`ii iii <br />TYPICAL CUT AND FILL RECLAMATION <br />NOTES: <br />VARS. ,-MINING FACE/ <br />SIDE SLOPE <br />TOPSOIL (4" MIN.) <br />OVERBURDEN <br />BACKFILL (1' MIN.) <br />Cut and fill or a combination of backfilled cut and fill sloping will be <br />used to create final reclaimed side slopes. The approach for final <br />side slope reclamation will be determined os mining progresses and <br />quantities of available overburden and overall pit depths become <br />known in more detail. <br />Final slopes will have a 3H:1V or flatter slope. <br />The outlet of the reclaimed area will be smoothly feathered into the <br />undisturbed land to the south of the moximum extent of mining and <br />disturbance <br />Silt fence or other BMPs will be used to control sediment discharge <br />from the pit until the vegetation is developed <br />SHALE <br />NJ S. <br />SHEET 2 <br />OF 2 <br />DATE December2011 <br />REGULAR 112 PERMIT AMENDMENT <br />FOUNTAIN PIT M- 1982 -155 <br />SCHMIDT CONSTRUCTION COMPANY <br />EXHIBIT F -2 <br />RECLAMATION PLAN <br />TYPICAL SECTION <br />BLUE EARTH P' <br />WILLIAM SCHENDERLEIN <br />