My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-22_REVISION - M1982155
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982155
>
2011-12-22_REVISION - M1982155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:25:35 PM
Creation date
12/28/2011 7:23:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982155
IBM Index Class Name
REVISION
Doc Date
12/22/2011
Doc Name
Response to Adequacy Review
From
Blue Earth
To
DRMS
Type & Sequence
AM1
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEGEND: <br />GRAVEL PIT ON FT. CARSON 5 <br />(UNRELATED TO FOUNTAIN PIT) 5120 - <br />/ ' <br />' 5 040 \ <br />\ <br />NORTH <br />( IN FEET ) <br />1 inch = 300 ft <br />11, o <br />— — — Proposed Amendment /Affected Land Boundary <br />0 <br />0) <br />300 0 300 600 900Feet <br />5710 <br />SCALE: NOTES: <br />5720 <br />/ <br />/ <br />/ <br />/ <br />/ <br />ROAD TO BE REAUGNED <br />FOLLOWING RECLAMATION <br />LOCKED GATE INTO <br />FORT CARSON <br />— CHARTER OAK <br />RANCH ROAD <br />ENTRANCE TO <br />AMENDMENT AREA <br />CURRENT FOUNTAIN PIT <br />PERMIT M- 1982 -155 <br />BOUNDARY <br />1 <br />Reclamation Plan assumes that Charter Oak Ranch Road is no longer <br />needed for public access. <br />Cut and fill or a combination of bockfilled cut and fill sloping will be <br />used to create final reclaimed side slopes. The approach for final <br />side slope reclamation will be determined as mining progresses and <br />quantities of available overburden and overall pit depths become <br />known in more detail. <br />Final slopes will primorily be created by cut and fill (see Figure F -2 <br />In Reclamation Plan). <br />Final slopes will have a 3H:1V or flatter slope <br />The outlet of the reclaimed area will be smoothly feathered into the <br />undisturbed land to the south of the maximum extent of mining and <br />disturbance <br />Silt fence or other Best Management Practices will be used to control <br />sediment discharge from the pit until the vegetation is developed. <br />The overburden /topsoil stockpile area will be disced or ripped shallowly <br />after removal of the stockpiles and prior to seeding <br />SHEET 1 <br />OF 2 <br />DATE December 2011 <br />REGULAR 112 PERMIT AMENDMENT <br />FOUNTAIN PIT M- 1982 -155 <br />SCHMIDT CONSTRUCTION COMPANY <br />EXHIBIT F -1 <br />RECLAMATION PLAN MAP <br />BLUE EAR <br />fadji <br />WILLIAM SCHENDERLEIN <br />
The URL can be used to link to this page
Your browser does not support the video tag.