Laserfiche WebLink
Loader Worksheet Cont'd Task # 005 Page 2 of 2 <br />Job Condition Correction Factors <br />Site Altitude: 7560 feet <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />1.00 <br />0.83 <br />0.83 <br />Source <br />(CAT HB) <br />(1 shift/day) <br />multiplier <br />Total Travel Time: 0.7363 minutes <br />Total Cycle Time: 1.2463 minutes <br />Load Bucket Capacity <br />Rated Capacity: 4.30 LCY (heaped) <br />Bucket Fill Factor: 0.825 Blasted rock - avg. blasted (75 - 90 %) 0.825 <br />Adjusted Capacity: 3.55 LCY <br />Unadjusted Hourly Unit Production: 170.79 LCY/Hour <br />Adjusted Hourly Unit Production: 141.76 LCY/Hour <br />Adjusted Hourly Fleet Production: 141.76 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: 1.58 Hours <br />Unit cost: $0.753 /LCY Total job cost: $169.00 <br />CIRCES Cost Estimating Software <br />