Laserfiche WebLink
Cycle Time Factors <br />Length <br />(feet) <br />Factor (min) <br />Source <br />Material: <br />Material 6" and over diameter 0.03 <br />0.030 <br />(Cat HB) <br />Stockpile: <br />Dumped by truck 0.02 <br />0.020 <br />(Cat HB) <br />Truck Ownership: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Task description: Install Rip Rap in Drainage Ditches <br />Site: Weber Pit No 2 <br />PROJECT IDENTIFICATION <br />Task #: 005 State: Colorado <br />Date: 12/19/2011 County: Archuleta <br />User: KAP <br />Cost Breakdown: <br />Agency or organization name: DRMS <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: $106.81 <br />MATERIAL QUANTITIES <br />Initial volume: 224 <br />Loose volume: <br />HOURLY PRODUCTION <br />Loader Cycle Time: <br />Haul and Return Time <br />WHEEL LOADER - LOAD AND CARRY WORK <br />224 <br />Source of estimated swell factor: Cat Handbook <br />Permit Action: 2011 Inspection Permit/Job #: M1995056 <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 950H Horsepower: 197 <br />Attachment 1: ROPS Cab Shift Basis: 1 per day <br />Data Source: (CRG) <br />$25.73 <br />$42.60 <br />$38.49 <br />$106.81 <br />CCY <br />LCY <br />Utilization % <br />NA <br />100 <br />NA <br />Swell factor: 1.000 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Unadjusted Basic Cycle Time (load, dump, maneuver): <br />Net Cycle Time Adjustment: <br />0.010 <br />Adjusted Basic Cycle Time: 0.510 <br />Rolling Resistance — Road Conditions <br />Haul: Soft, rutted dirt, no maintenance or water, 4" tire penetration 8.0 <br />Return: Soft, rutted dirt, no maintenance or water, 4" tire penetration 8.0 <br />Abbreviation: None <br />0.500 <br />Page 1 of 2 <br />Filename: M056 -005 <br />minutes <br />minutes <br />minutes <br />CIRCES Cost Estimating Software <br />Length <br />(feet) <br />Grade Res. <br />( %) <br />Rolling <br />Res. ( %) <br />Total Res. <br />( %) <br />Travel Time <br />(minutes) <br />Source <br />Haul Route: <br />300 <br />5.00 <br />8.00 <br />13.00 <br />0.5084 <br />(Cat HB) <br />Return Route: <br />300 <br />-5.00 <br />8.00 <br />3.00 <br />0.2279 <br />(Cat HB) <br />Task description: Install Rip Rap in Drainage Ditches <br />Site: Weber Pit No 2 <br />PROJECT IDENTIFICATION <br />Task #: 005 State: Colorado <br />Date: 12/19/2011 County: Archuleta <br />User: KAP <br />Cost Breakdown: <br />Agency or organization name: DRMS <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: $106.81 <br />MATERIAL QUANTITIES <br />Initial volume: 224 <br />Loose volume: <br />HOURLY PRODUCTION <br />Loader Cycle Time: <br />Haul and Return Time <br />WHEEL LOADER - LOAD AND CARRY WORK <br />224 <br />Source of estimated swell factor: Cat Handbook <br />Permit Action: 2011 Inspection Permit/Job #: M1995056 <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 950H Horsepower: 197 <br />Attachment 1: ROPS Cab Shift Basis: 1 per day <br />Data Source: (CRG) <br />$25.73 <br />$42.60 <br />$38.49 <br />$106.81 <br />CCY <br />LCY <br />Utilization % <br />NA <br />100 <br />NA <br />Swell factor: 1.000 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Unadjusted Basic Cycle Time (load, dump, maneuver): <br />Net Cycle Time Adjustment: <br />0.010 <br />Adjusted Basic Cycle Time: 0.510 <br />Rolling Resistance — Road Conditions <br />Haul: Soft, rutted dirt, no maintenance or water, 4" tire penetration 8.0 <br />Return: Soft, rutted dirt, no maintenance or water, 4" tire penetration 8.0 <br />Abbreviation: None <br />0.500 <br />Page 1 of 2 <br />Filename: M056 -005 <br />minutes <br />minutes <br />minutes <br />CIRCES Cost Estimating Software <br />