My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-22_REVISION - M1995056
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995056
>
2011-12-22_REVISION - M1995056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:25 AM
Creation date
12/22/2011 4:38:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995056
IBM Index Class Name
REVISION
Doc Date
12/22/2011
Doc Name
SI-01 Weber Pit #2
Type & Sequence
SI1
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Weber Pit No 2 <br />PROJECT IDENTIFICATION <br />Task #: 006 State: Colorado <br />Date: 12/19/2011 County: Archuleta <br />User: KAP <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 307D 7' -3" Stick <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Load Bucket Capacity <br />HYDRAULIC EXCAVATOR WORK <br />Place Rip Rap in Drainage Ditches <br />Permit Action: 2011 Inspection Permit/Job #: M1995056 <br />$15.06 <br />$18.88 <br />$38.67 <br />$72.62 <br />Total Fleet Cost/Hour: $72.62 <br />MATERIAL QUANTITIES <br />Initial volume: 224 CCY <br />Loose volume. 224 LCY <br />Source of estimated swell factor: Cat Handbook <br />Utilization % <br />NA <br />100 <br />NA <br />Horsepower: 56 <br />Weight (MT): 7.23 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Swell factor: 1.000 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty): <br />Basic Job Condition Description: AVERAGE <br />Secondary Job Condition within Basic Description: AVERAGE <br />Cycle Time Value: 0.242 <br />Rated Capacity: 0.20 LCY (heaped) <br />Bucket Fill Factor: 0.450 Rock - Poorly blasted (40% - 50 %) 0.450 <br />Adjusted Capacity: 0.09 LCY <br />Job Condition Correction Factors Site Altitude: 7560 feet <br />Source <br />Altitude Adj: 0.87 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.72 multiplier <br />Unadjusted Hourly Unit Production: 22.31 LCY/Hour <br />Adjusted Hourly Unit Production: 16.11 LCY/Hour <br />Adjusted Hourly Fleet Production: 16.11 LCY/Hour <br />Unit cost: $4.507 /LCY Total job cost: $1,010.00 <br />Abbreviation: None <br />Filename: M056 -006 <br />Bucket Size Class: Small <br />minutes <br />JOB TIME AND COST <br />Fleet size: 1 Excavator Total job time: 13.90 Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.