Laserfiche WebLink
RPR. 9.2092 2~26PM CYPRUS SHOSHONE <br />no.9a7 P.2/2 <br />RELOCATION OF BATCH WEIGH LOADOUT HAULROAD AND <br />INSTALLATION OF FAN SILENCER AT EMD VENT STI'E (Mlt 02478) <br />Concrete Footers and Piers <br />Footers (a) <br />3.3'x3.5'xl' = 1.8cy <br />$ 9S <br />Picts (a) <br />Radius - .6', height - a' _ .Icy ~? <br />Submral $ 132 <br />Steel Supports <br />Supports 122 If x ~8.90/lf $1086 <br />Cross Braces 4 x 17' = 68 If x $8.90/If 60 <br />Subtotal $1691 <br />Silencer and buetwork <br />Silencer <br />10' x 10'x26' =2600 cfx $0.13/cf <br />Ductwork <br />5' x 5' x 12' = 300cf x $0.13/cf <br />Subtotal -Direct Costs <br />Indirect and Administrative Costs (15°h) <br />Proiect Total Coat <br />MR 02-178 <br />95 <br />$ 338 <br />$ 39 <br />Subtotal $ 377 <br />$2200 <br />$ 330 <br />$2530 <br />oaioe~o2 <br />