Laserfiche WebLink
TR 97-30 Batch Weigh/Loadout Haulroad <br />/ ~9, <br />I. Removal of Gravel Fill Material and Berm <br />875' x 54' x 2' = 94,500 cf = 3,500 cy <br />3,500 cy @ $2.38/cy = <br />I1. Removal of Geo-grid and Geo-fabric <br />875 If @ $1.59/If = <br />fll. Culvert Removal <br />70' - 42"diameter @ $44.59/If = <br />IV. Ripping of Topsoil <br />Assume DION dozer <br />.Average speed = I mph <br />1.21 acres ~. 2 feet deep = 3889 BCY <br />3889 BCY ct 1796.07 BCY/hr=2.171trs <br />2. (7 firs x $198.67Av = <br />V. Revegetation <br />Assume cost for seed, disking, harrowing, contour furrowing, <br />and fertilization @ $259.19/acre, <br />1.21 acres x $285.64 = <br />C~ <br />TR 97-30 Sub-Total = <br />Administration (17%) _ <br />TR 97-30 Total = <br />• <br />$ 8,330.00 <br />$ 1,391.25 <br />$ 3,121.30 <br />$ 431.1 I <br />$ 345.62 <br />$ 13,619.28 <br />$ 2.315.28 <br />$ 15,934.56 <br />APPROVED NOV 2 4 1997 <br />TR 97-30 2.05-54(f)(70) 8/25/97 <br />