Laserfiche WebLink
RELOCATION OF BATCH WEIGH LOADOUT HAULROAD AND <br />INSTALLATION OF CONCRETE PADS NEAR WELD SHOP (MR 01-174) <br />Concrete Pads and Apron Removal <br />Demolish concrete pads and apron - 189y x $6.68/cy 1,263 <br />Subtotal $ 1,263 <br />Removal of Haulroad <br />Removal of Gravel Fill Material and Berm <br />550' x 54' x 2' = 59400 cf = 2200 cy <br />2200 cy @ $2.38/cy $5,236 <br />Removal of Geo-grid and/or fabric <br />550 ` @ $1.59/]f $ 875 <br />Culvert Removal <br />70' of 48" diameter @ $44.59/If $3,121 <br />Topsoil Replacement <br />500 cy @ $1.50/cy $ 750 <br />Revegetation <br />.5 acres @ $285.64/acre $ 143 <br />Subtotal $10,125 <br />• Subtotal-Direct Costs $11,388 <br />Indirect and Administrative Costs (8%) $ 911 <br />Project Total Cost $12,299 <br /> <br />L J <br />MR 01-174 94 9/26/01 <br />