My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-16_REVISION - M1977572 (71)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977572
>
2011-12-16_REVISION - M1977572 (71)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:05:25 PM
Creation date
12/20/2011 12:31:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977572
IBM Index Class Name
REVISION
Doc Date
12/16/2011
Doc Name
Submittal
From
VALCO
To
DRMS
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.3.2 Riprap <br />The proposed Berm A inlet will be protected with angular rock riprap at the top, bottom, and <br />sides of the inlet. Several flooding conditions were analyzed to develop hydraulic parameters to <br />determine the stable riprap size. Two likely flow conditions indicate a maximum D50 of 12 to 14 inches <br />while a worst case scenario specified a D50 of 16 to 18 inches. The analyses assume uniform flow across <br />the riprap blanket and do not account for turbulent hydraulic forces which may be present on spillways <br />and around bridge piers. Therefore, a riprap gradation with a minimum D50 of 18 inches is <br />recommended. Documentation supporting the determination of the riprap size is provided in <br />Appendix E.2. The recommended gradation for the riprap is on the design plans located in Appendix C. <br />4.4 Outlet Pipe Design <br />The outlet pipes in each pit were designed to release the volume of water captured by the pit <br />after a flood recedes. The elevation of the normal water surface elevation in the pit will, over a period <br />of time, vary with the stage of the river. The minimum normal water surface elevation was assumed to <br />be within one -foot of the general river invert along each pit (see Appendix D.1). <br />The maximum normal water surface elevation in the pit was assumed to be represented <br />generally by the river water surface elevation which is not exceeded more than approximately 30 <br />percent of the time during the irrigation season (May to August). Documentation supporting the <br />determination of the minimum normal high water surface elevation is provided in Appendix D.2. <br />The outlet pipe invert from each pit was set to drain the captured volume of water above the <br />maximum normal water surface elevation in less than 72 hours after the water surface elevation in the <br />main channel recedes. The evaluation documented in Appendix D.2 indicates that Pits 1, 3, and 4 will <br />require outlet pipes with diameters of 12, 18, and 24 inches respectively. <br />COVALCOO1_Phase 11 Report_082211.docx <br />4.4 ANdERSON CONSULTING ENGINEERS, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.