V. PROPOSED CONDITION HYDRAULIC ANALYSIS <br />A hydraulic analysis of the proposed conditions was conducted in order to ensure that 100 -year <br />water surface elevations are at or below the established corrected effective condition 100 -year water <br />surface profile. Hydraulic analysis of additional flood events was also conducted in order to support the <br />design of the proposed Berm A spillway. <br />5.1 Proposed Condition Floodplain Analysis <br />A proposed condition HEC -RAS model was developed by modifying the existing condition cross <br />section to incorporate the proposed site grading. It should be noted that all cross section locations are <br />coincident with the existing condition analysis. <br />A comparison of 100 -year water surface elevations for the corrected effective, existing, and <br />proposed condition is provided in Table 5.1. A graphical comparison of 100 -year water surface <br />elevations is provided in Figure 5.1 and Figure 5.2. The comparison shows that the proposed conditions <br />water surface elevations are at or in some cases lower than the corrected effective condition. Results of <br />the proposed condition analysis meet 100 -year floodplain criteria based upon the best available <br />information. In addition, proposed condition 100 -year water surface elevations do not adversely affect <br />adjacent properties. <br />5.2 Berm 'A' Spillway Hydraulic Analysis <br />An additional proposed condition hydraulic model was developed to analyze low flow conditions <br />associated with the Berm A spillway. The purpose of the model is to determine the discharge and <br />frequency at which the Berm A spillway will begin to pass flow. Results of the analysis will also be used <br />to support the design of the proposed Berm A erosion protection. <br />5.2.1 Annual Flow Duration Analysis <br />The proposed Berm A spillway will begin spilling when a total discharge of approximately 865 cfs <br />is in the Arkansas River. The wet, average, and dry annual flow duration curves presented in Section 2.2 <br />were used to estimate how many days per year flow may overtop and pass through the proposed Berm <br />A spillway. Historically, between 1949 and 2009 a daily average discharge of 865 cfs was exceeded for <br />79 days during water year 1987 (wet year), for a total of 2 days during 1949 (average year), and 0 days in <br />2003 (dry year), see Figure 5.3. The average number of days per year 865 cfs was exceeded during the <br />entire period between 1949 and 2009 was determined to be 6 days (or 1.7% of the time). <br />COVALCOO1_Phase 11 Report_082211.docx <br />5.1 ANdERSON CONSULTING ENGINEERS, INC. <br />